Stage Accumulation
The Stage Accumulation constraint is used to specify a maximum constraint for any item in the model, on a stage by period basis. You can use this constraint limit the following items:
-
Ore tonnes
-
Total tonnes
-
Drilling hours
-
Acid consumption
-
Contaminant levels
Note:
The stage accumulation constraint is a hard constraint Evolution must obey this constraint when generating a schedule..