Process Setup
Source file: origin-block-setups-flowchart.htm
The Process Setup tab is used to define the flow of material from the pit to various processes in the setup. It contains three separate subtabs:
-
Material Flow: Used to add and link process flow components.
-
Configuration: Used to define static parameters per process flow component included in the setup.
-
Parcel Reporting: Used to sort mined material into parcels and define the material properties of different material types within each block