Pit Accumulation
Source file: strategy-setups-constraints-pit-accumulation.htm
The Pit Accumulation constraint allows you to specify a maximum accumulation value for a given model, on a period by period basis. You can use this constraint to limit the following items:
-
Ore tonnes
-
Total tonnes
-
Drilling hours
-
Acid consumption
-
Contaminant levels
Note
The pit accumulation constraint is a hard constraint Evolution must obey this constraint when generating a schedule..