Stage Bench Turnover
Source file: strategy-setups-constraints-stage-bench-turnover.htm
The Stage Bench Turnover constraint allows you to specify the maximum number of benches allowed in the schedule.
Note
The stage bench turnover constraint is a hard constraint Evolution must obey this constraint when generating a schedule..
A blank entry will result in an open value or unlimited bench turnover whereas a value of 0 (zero) will prevent any benches being mined in the stage.