Waste Area Rate of Rise

Source file: origin-reserve-setups-constraints-waste-area-rate-of-rise.htm

Use the Waste Area Rate of Rise constraint to limit the number of active benches per waste area in each period. You can apply this constraint to both waste utilities and virtual waste dumps.

  • Click the button once to copy the properties of the current period to the next period.

  • Double-click the button to copy the properties of the current period to the subsequent periods until the end of the schedule.

  • Alternatively, copy a cell's setting using Ctrl+C , then paste it into selected cells with Ctrl+V.

Tip:  When you input the value in the field next to the Populate Empty Cells button and click it, all empty cells corresponding to waste areas will be populated with the value you have entered.