Pit Accumulation
Source file: strategy-setups-constraints-pit-accumulation.htm
Use the Pit Accumulation constraint to specify the maximum accumulation value for a given model, on a period by period basis. You can use this constraint to limit items like the following:
-
Ore tonnes
-
Total tonnes
-
Drilling hours
-
Acid consumption
-
Contaminant levels
Follow these steps to determine pit accumulation for each period:
-
Select the pit model from the Item drop-down.
-
Select the accumulation variable from the drop-down menu.
-
For the selected variable, specify the total amount that can be mined from the selected pit in each period.
-
Click the
button once to copy the properties of the current period to the next period.
-
Double-click the
button to copy the properties of the current period to the subsequent periods until the end of the schedule.
-
Alternatively, copy a cell's setting using Ctrl+C , then paste it into selected cells with Ctrl+V.