Pit Accumulation

Source file: strategy-setups-constraints-pit-accumulation.htm

Use the Pit Accumulation constraint to specify the maximum accumulation value for a given model, on a period by period basis. You can use this constraint to limit items like the following:

  • Ore tonnes

  • Total tonnes

  • Drilling hours

  • Acid consumption

  • Contaminant levels

Follow these steps to determine pit accumulation for each period:

  1. Select the pit model from the Item drop-down.

  2. Select the accumulation variable from the drop-down menu.

  3. For the selected variable, specify the total amount that can be mined from the selected pit in each period.

  • Click the button once to copy the properties of the current period to the next period.

  • Double-click the button to copy the properties of the current period to the subsequent periods until the end of the schedule.

  • Alternatively, copy a cell's setting using Ctrl+C , then paste it into selected cells with Ctrl+V.