Process Accumulation
Source file: strategy-setups-constraints-process-accumulation.htm
Use the Process Accumulation constraint to specify a range of accumulation values for any item in the model, on a process by period basis. You can use this constraint to limit items like the following:
-
Ore tonnes
-
Total tonnes
-
Acid consumption
-
Contaminant levels
Follow these steps to determine process accumulation for each period:
-
Select the process from the drop-down.
-
Select the item from the Item drop-down.
-
For the selected item, set the upper and lower limit in each period.
-
Click the
button once to copy the properties of the current period to the next period.
-
Double-click the
button to copy the properties of the current period to the subsequent periods until the end of the schedule.
-
Alternatively, copy a cell's setting using Ctrl+C , then paste it into selected cells with Ctrl+V.