Stage Bench Turnover

Source file: strategy-setups-constraints-stage-bench-turnover.htm

Use the Stage Bench Turnover constraint to specify the maximum number of benches allowed per stage per period in the schedule.

Note:  The Stage Bench Turnover is a hard constraint.

To specify the maximum number of benches that can be mined in a period from each stage, input the required number in the corresponding cell.

Important:  A blank entry will result in an open value or unlimited bench turnover whereas a value of 0 (zero) will prevent any benches being mined in the stage.

  • Click the button once to copy the properties of the current period to the next period.

  • Double-click the button to copy the properties of the current period to the subsequent periods until the end of the schedule.

  • Alternatively, copy a cell's setting using Ctrl+C , then paste it into selected cells with Ctrl+V.