Stage Bench Turnover
Source file: strategy-setups-constraints-stage-bench-turnover.htm
Use the Stage Bench Turnover constraint to specify the maximum number of benches allowed per stage per period in the schedule.
Note: The Stage Bench Turnover is a hard constraint.
To specify the maximum number of benches that can be mined in a period from each stage, input the required number in the corresponding cell.
Important: A blank entry will result in an open value or unlimited bench turnover whereas a value of 0 (zero) will prevent any benches being mined in the stage.
-
Click the
button once to copy the properties of the current period to the next period.
-
Double-click the
button to copy the properties of the current period to the subsequent periods until the end of the schedule.
-
Alternatively, copy a cell's setting using Ctrl+C , then paste it into selected cells with Ctrl+V.