Capacities

Use the Capacities section to set up the capacities for the mining, plant and recovery processes.

Mining Capacity

Enter the maximum rock movement, ore and waste, that can be achieved in each period. Shortcuts can be used for large numbers, for example, '100;P3:150' indicates that the capacity will be 100 from period 1 through 2 before changing to 150.

Note:   Shortcuts after decimal places will be interpreted as the corresponding zeroes after the decimal place, for example, '5.1c1' will be interpreted as 5.1001.

Treating Capacity

Enter the maximum process capacity. Different limits can be specified for each period. The syntax used to define the process limits is similar to the syntax used with rock limits.

Marketing Capacity

Enter the maximum selling or production capacity for each of the products. A different capacity specification can be specified for each product. The syntax used to define the limits is similar to the syntax used with rock limits.


Related topics