Redo 
Reinstate Cancelled Changes
Use the Redo option to reinstate (redo) changes that were cancelled (undone) by using the Move Blocks > Undo option. The Redo option must immediately follow the Undo operations.
Note: This option is only relevant to the options under the Move Blocks submenu and should not be used to redo any other option from any other menu. It is in no way related to the Redo option under the Design menu.
This option can also be accessed by selecting the Redo button from the Dragline - Move Blocks toolbar.
Selection of the Redo option will reinstate the last cancelled change, selecting Redo again will reinstate the previous cancelled change and so forth.
If a Dragline specifications file (.rsp
) was not opened prior to selecting this option, then the Open Dragline Specification panel displays first.
Open Dragline Specification panel
Spec file name
Enter, or select from the drop-down list, the <spec_file_id>
part of the dragline specifications file name. The maximum size is 6 alphanumeric characters. Selecting a name from the drop-down list will open an existing specifications file. Entering a new name will create a new specifications file.
Click OK.