Whittle 4D Interface

Terminology

There are several subtle differences in the terminology used in the Vulcan and 4D documentations. In particular you should note the following:

Vulcan 4D
Ore Parcel
similar to 4D usage but is represented as a set of columns (tons & metal for each ore type)
Ore Parcel
the mineralised part of a block (for each rock type). Each parcel is an additional line in the model.
Milling CAF Processing Cost Adjustment Factor
Ore Type Rock Type
containing some metal in defined units.
Mining Cost of Metal Metal Cost of Mining (MCOSTM)
the amount of metal that must be recovered to pay for mining a ton of rock mined.
Processing Ratio CRATIO (Processing Cost) / (Mining Cost)
Use all blocks inside model Active blocks indicator = 1
Use all blocks in model file only Active blocks indicator = 3

There is a comprehensive glossary of terms at the back of the 4D User Manual.