Resources
The Resources tab provides a platform to provide equipment and process component productivity and usage information. It contains the following tabs:
- Resource Groups — Configures the availability and productivity of equipment and process flow components.
- Pit Resource Allocation — Allocates diggers and trucks to the mining pit.
- Stockpile Resource Allocation — Allocates diggers and trucks to the stockpile.
- Max Speed — Configures road speeds and rolling resistance.
- Advanced Options — Advanced configuration of road networks.
- Parcel Truck Payload — Configures a single trip per parcel.
- Equipment Wait Times — Configures times other than material transfer time.
- Stockpile Productivity — Configures the reclaim productivity for each stockpile.