The   Fixed Cut-Offs tab is used to define the target cut-off grade per primary element per period. If values of zero are provided for every period, Evolution will perform cut-off grade optimisation. This means that the Evolution will choose the optimal cut-off grade for each period. Otherwise the provided values will be used.
 Fixed Cut-Offs tab is used to define the target cut-off grade per primary element per period. If values of zero are provided for every period, Evolution will perform cut-off grade optimisation. This means that the Evolution will choose the optimal cut-off grade for each period. Otherwise the provided values will be used.
                                             
                                        
The Force Process Ranking checkbox, when selected, forces the following to take place:
- 
                                                Calculating the overall breakeven cut-off for all processes. 
- 
                                                Ordering the processes by their breakeven cut-off. 
- 
                                                Enforcing the rankings by Evolution. 
To make it clear, let us go through a worked example. Suppose the Force Process Ranking checkbox is selected. Consider the following list of processes: Mill A, Mill B and Mill C. Evolution will now calculate the overall breakeven cut-off for each process. Suppose the values calculated are as follows:
- 
                                                Mill A — 0.8 
- 
                                                Mill B — 0.65 
- 
                                                Mill C — 0.4 
Because the behaviour has been enforced by checking the checkbox, Evolution will ensure that Mill A will always have a cut-off greater than Mill B and Mill C, and Mill B will always have a cut-off greater than Mill C.