Process Setup
Source file: epoch-setups-flowchart.htm
The Process Setup tab contains the following subtabs:
-
Material Flow: Used to add and link process flow components.
-
Configuration: Used to define static parameters per process flow component included in the setup.
-
Parcel Reporting: Used to categorise the mined material by tonnage, volume and swell factor.
-
Destination Priority: Used to specify the priority order according to which the material will be sent to each destination in the Epoch schedule timeline.