Process Setup

Source file: origin-block-setups-flowchart.htm

The Process Setup tab is used to define the flow of material from the pit to various processes in the setup. It contains three separate subtabs:

  • Material Flow: Used to add and link process flow components.

  • Configuration: Used to define static parameters per process flow component included in the setup.

  • Parcel Reporting: Used to sort mined material into parcels and define the material properties of different material types within each block