Calendar

Source file: origin-block-setups-calendar.htm

Use the Calendar tab to define resources, and set the accumulation and usage targets in each period.

The subtabs listed under the Calendar tab in the Origin Blocks module will depend on the type of your setup (Material Movement or Equipment) and objectives that you determine.

The following Calendar subtabs can be available in your setup:

  • Targets: Specifies targets and target values in each period for each processing node, stockpile, and equipment of a setup.

  • Material Movement: Controls the target tolerance for each period of the schedule.

  • Net Present Value: Specifies financial factors that will be used to calculate and optimise for NPV.

  • Equipment: Specifies values related to equipment used in the schedule (fuel cost per litre, truck count, cost per operating hour, etc.). Evolution will use these values to simulate the effects of material loading and haulage.

  • Min/Max : Targets a required grade profile or an accumulation of a model item per period.

  • Blend: Determines the destination of an ore parcel per period based on its blend target.

The table below shows the availability of subtabs in each setup:

Targets Material Movement, Equipment
Material Movement Material Movement
Net Present Value Material Movement, Equipment
Equipment Equipment
Min/Max Material Movement, Equipment
Blend Material Movement, Equipment