Terrace Mining menu contents

Set Up

Use the Set Up option to set the limiting topography surface, and the sequence of horizons from the topography surface down.

Specification

Use the Specification option to specify how the reserves are to be calculated.

Run Reserves

Use the Run Reserves option to calculate block reserves based on the specification file configured through the Specification option.

Report

Use the Report option to generate a report file of each block's calculated reserves. Mining loss and dilution figures can also be included.