Calendars in Epoch
Use the
Calendars tab to configure resource parameters by defining mill and stockpile productivity or target accumulation values, and set the required minimum and maximum blending targets for each mill. The tab hosts the following subtabs:
|
|
Set resource parameters and configure mills and stockpiles by either setting their productivity rate or entering their target accumulation value for the amount of the processed material in a given period. |
|
|
Set the minimum and maximum blending targets for each mill, as required. |