Origin Blocks Setup Configuration
Source file: 2-origin-blocks-setup-configure.htm
Once an Origin Blocks setup is created, it needs to be configured so that it contains the necessary information for schedule generation.
Origin Blocks setup configuration is divided into a number of tabs. Each tab represents an aspect of the setup the software requires to schedule the mine. The following is a list of tabs that need to be configured for an Origin Blocks setup to be ready for server submission:
|
|
Add process flow components to your setup. |
![]() |
Objectives (Equipment/Material Movement) Set specific outcomes the schedule aims to achieve. |
|
|
Specify targets for each period. |
|
|
Specify stage constraints for each period. |
|
|
Specify a miscellaneous set of setup constraints. |
|
|
Specify a set of setup constraints for each period. |
|
|
Define constraints surrounding schedule generation, add reporting items to the schedule report, and define grade bins (optional). |
|
|
View your models in 3D and configure road networks. |