Introduction

Drilling, blasting, and mining typically are not performed on a single solid within a bench. Instead, multiple solids form a bench area that must be drilled and blasted together as a single blast operation before mining can begin. This tutorial outlines a method for managing this process using a combination of dependencies and task lists in Evolution.

Note:  This tutorial limits the schedule to a single bench for simplicity, but you can follow the same process for the entirety or a portion of a complete schedule.

Tip:  Before you begin, download the data used in this tutorial

In the tutorial, we will configure our setup as follows: