Origin Solids Setup Configuration
Source file: 2-origin-solids-setup-configure.htm
Once an Origin Solids setup is created, it needs to be configured so that it contains the necessary information for schedule generation.
Origin Solids setup configuration is divided into a number of tabs. Each tab represents an aspect of the setup the software requires to schedule the mine. The following is a list of tabs that need to be configured for an Origin Solids setup to be ready for server submission:
|
|
Add process flow components to a setup. |
![]() |
Objectives (Equipment/Material Movement) Define specific outcomes the schedule aims to achieve. |
|
|
Define targets for each period. |
|
|
Optimise mining sequences by setting schedule seeding and reclaims. |
|
|
Define a set of setup constraints in each period. |
|
|
Define constraints surrounding schedule generation. |
|
|
View your models in 3D and configure Gantt charts, dependencies, and road networks. |