Origin Solids Setup Configuration

Source file: 2-origin-solids-setup-configure.htm

Once an Origin Solids setup is created, it needs to be configured so that it contains the necessary information for schedule generation.

Origin Solids setup configuration is divided into a number of tabs. Each tab represents an aspect of the setup the software requires to schedule the mine. The following is a list of tabs that need to be configured for an Origin Solids setup to be ready for server submission:

Process Setup

Add process flow components to a setup.

/

Objectives (Equipment/Material Movement)

Define specific outcomes the schedule aims to achieve.

Calendar

Define targets for each period.

Mining

Optimise mining sequences by setting schedule seeding and reclaims.

Constraints

Define a set of setup constraints in each period.

Engine Parameters

Define constraints surrounding schedule generation.

Viewer

View your models in 3D and configure Gantt charts, dependencies, and road networks.