Strategy Setup Configuration

Once you create a Strategy setup, you need to configure it to include the necessary information for schedule generation.

Strategy setup configuration is divided into a number of tabs. Each tab represents an aspect of the setup that the software requires to schedule the mine. The following is a list of tabs that need to be configured for a Strategy setup to be ready for server submission:

Process Setup

Add process flow components to your setup.

Tonnage & Grade

Specify total tonnage, ore tonnage, as well as primary and secondary elements.

Lithology

Define lithology types that can be refined by each process in your setup.

Targets & Economics

Specify the economic profile of your setup.

Fixed Cut-Offs

Specify the process cut-off grade manually or allow the software to perform cut-off grade optimisation.

Constraints

Specify a set of setup constraints for each period.

Reporting

Add reporting items to the schedule report.

Engine Parameters

Specify constraints surrounding schedule generation.

Note:  Specifying engine parameters is optional.