Strategy Setup Configuration
Once you create a Strategy setup, you need to configure it to include the necessary information for schedule generation.
Strategy setup configuration is divided into a number of tabs. Each tab represents an aspect of the setup that the software requires to schedule the mine. The following is a list of tabs that need to be configured for a Strategy setup to be ready for server submission:
|
|
Add process flow components to your setup. |
|
|
Specify total tonnage, ore tonnage, as well as primary and secondary elements. |
|
|
Define lithology types that can be refined by each process in your setup. |
|
|
Specify the economic profile of your setup. |
|
|
Specify the process cut-off grade manually or allow the software to perform cut-off grade optimisation. |
|
|
Specify a set of setup constraints for each period. |
|
|
Add reporting items to the schedule report. |
|
|
Specify constraints surrounding schedule generation. Note: Specifying engine parameters is optional. |
Previous1. Create a SetupNext3. Validate the Setup