Calendar in Origin Solids
Source file: origin-solids-setups-calendar.htm
Use the
Calendar tab to define resources and set the targets for each period.
The subtabs that appear depend on your setup type (Material Movement or Equipment) and selected objectives.
The following Calendar subtabs can appear in your setup:
|
|
Specify targets and target values in each period for each processing node, stockpile, and equipment unit of a setup. |
|
|
Control the target variance for each period of the schedule. Note: The subtab only applies to Material Movement setups. |
|
|
Specify financial factors that will be used to calculate and optimise for NPV. |
|
|
Specify values related to equipment used in the schedule (such as fuel cost per litre, truck count, and cost per operating hour). Evolution will use these values to simulate the effects of material loading and haulage. Note: The subtab only applies to Equipment setups. |
|
|
Prioritise mining sequences to achieve blend targets and improve grade outcomes. Redirect material from stockpiles to processes, and between processes when needed. |