Skip to main content
Maptek Account
Support
All Files
Home
Getting Started
Getting Started with Evolution Projects
Creating a New Project
Opening an Existing Project
Interface Overview
Settings
Importing or Creating a Model
Evolution Cloud Service
Key Concepts
Models
Models in Evolution
Block Models
Block Models in Evolution
Importing a Block Model
Transforming a Block Model
Reblocking a Block Model
Using the Block Model Viewer
Maths Scripts for Block Models
Updating a Block Model Using External Data
Overview
Updating a Waste Dump
Updating a Block Pit
Adding Toe Blocks
Solid Models
Solid Models in Evolution
Importing a Solid Model
Transforming a Solid Model
Using the Solid Model Viewer
Maths Scripts for Solid Models
Dynamic Solids Pits
Dynamic Solids Pits in Evolution
Importing a Dynamic Solids Pit
Road Networks
Road Networks in Evolution
Importing and Modifying Road Networks
Using the Waypoint Editor
Viewing a Road Network
Exporting or Importing a Waypoint Collection as a JSON File
Road Mathematics
Creating a Waypoint Collection
Adding and Removing Waypoints
Creating Trucks
Simple Stockpiles
Scripts
Scripts in Evolution
Common Maths Scripting Rules
Maths Scripting Functions
Python Scripts for Block and Solid Models
Reporting
Pivot Reporting
Python Report Scripting
Phase: Stage Design Module
Phase Module Overview
Creating a Phase Model
Phase Tools
Strategy Workflow
Introduction to Strategy
1. Create a Setup
2. Configure the Setup
Strategy Setup Configuration
Process Setup
Process Setup Overview
Material Flow
Material Flow Overview
Pit Models
Crusher and Standard Process
Stockpiles
Beneficiation Group
Configuration
Stage and Process Precedence
Tonnage & Grade
Lithology
Targets & Economics
Targets & Economics Overview
Calendar
Configuration
Variable Costs
Incremental Costs
Capital Layout
Fixed Cut-Offs
Constraints
Constraints in Strategy
Stage Dependency
Stage Lag
Stage Bench Turnover
Sink Rate
Ore Exposure
Global Accumulation
Pit Accumulation
Stage Accumulation
Stage Availability
Process Accumulation
Process Blend
Stage Sink Rate
Waste Dump Availability
Stockpile Availability
Reporting
Reporting Overview
Reporting Fields
Breakdown Field
Model Analysis & MIK
Engine Parameters
Summary
3. Validate the Setup
4. Generate a Schedule
5. View the Schedule
6. Analyse the Schedule
Strategy Schedule Analysis
Schedule Report
Mining Sequence
Strategy Schedule Viewer
Origin Blocks Workflow
Introduction to Origin Blocks
1. Create a Setup
2. Configure the Setup
Origin Blocks Setup Configuration
Process Setup
Process Setup Overview
Material Flow
Configuration
Parcel Reporting
Objectives
Objectives in Origin Blocks
Blend
Material Movement
Equipment
Net Present Value
Min/Max Objectives
Calendar
Calendar in Origin Blocks
Targets
Staging
Staging Overview
Stage Release
Stage Lag
Bench Release
Mining
Constraints
Constraints in Origin Blocks
Maximum Active Benches
Stage and Waste Utility Dependency
Stage Bench Turnover
Stage Equipment
Stockpile Reclaim Availability
Waste Area Availability
Waste Area Dependency
Waste Area Required Tonnage
In-Pit Crusher Location Dependency
Other
Other Tab Overview
Grade Bins
Mill Classification
Engine Parameters
Viewer
Viewer in Origin Blocks
View Manager
Properties
Road Network
3. Validate the Setup
4. Generate a Schedule
5. View the Schedule
6. Analyse the Schedule
Origin Solids Workflow
Introduction to Origin Solids
1. Create a Setup
2. Configure the Setup
Origin Solids Setup Configuration
Process Setup
Process Setup Overview
Material Flow
Configuration
Parcel Reporting
Screening Stations
Objectives
Objectives in Origin Solids
Material Movement
Equipment
Blend
Net Present Value
Calendar
Calendar in Origin Solids
Targets
Mining
Constraints
Constraints in Origin Solids
Bench Accumulation
Global Accumulation
Global Process Accumulation
Pit Accumulation
Parcel Waste Destination Priority
Pit Region Availability
Pit Region to Waste Region
Process Accumulation
Sink Rate
Stage Accumulation
Stage and Waste Utility Dependency
Stage Availability
Stage Bench Turnover
Stage Dependency
Stage Equipment
Stage Sink Rate
Stockpile Reclaim Availability
Stockpile Redirect Availability
Waste Area Availability
Waste Area Dependency
Waste Area Rate of Rise
Waste Area Required Tonnage
Engine Parameters
Viewer
Viewer in Origin Solids
Dependencies
View Manager
Properties
Road Network
3. Validate the Setup
4. Generate a Schedule
5. View the Schedule
6. Analyse the Schedule
Epoch Workflow
Introduction to Epoch
1. Create a Setup
2. Configure the Setup
Epoch Setup Configuration
Process Setup
Process Setup Overview
Material Flow
Parcel Reporting
User-Defined Targets
Destination Priority
Resources
Resource Groups
Truck Fleet Assignments
Max Speed
Wait Times
Truck Payloads
Stockpile Productivity
Advanced Options
Calendars
Resource Definitions
Blend
Appointments
Task Sequence
Task Sequence Overview
Task Keys
Virtual Solids
Task Lists
Resource Allocation
Activities
Activities Tab Overview
Activity Sequence
Resource Productivity
Reporting Fields
Constraints
Constraints in Epoch
Global Accumulation
Process Accumulation
Region Accumulation
Waste Area Accumulation
Destination Rate
Source Proportion
Viewer
Viewer in Epoch
Road Network
Dependencies
Schedule Playback
Mining Direction
Solid Cuts
View Manager
Properties
Task Lists
3. Validate the Setup
4. Generate and View the Schedule
5. Analyse the Schedule
Epoch Schedule Analysis
Export End of Period Solids
Export End of Period Surfaces
Live Dashboard
6. Refine the Schedule
Tutorials
Scheduling Drill and Blast
Introduction
Step 1: Create Drill and Blast Groups
Step 2: Set Task Keys
Step 3: Set Dependencies
Step 4: Create Task Lists
Step 5: Fine Tuning
Step 6: Review the Schedule
Quick Reference
How do I?
Import Haul Network Attributes with Trolley Data
Stamp Period and Rank Back to Model
Use the Quick and Advanced Validate Functions
Calculate the Marginal Cut-Off Grade or the Cut-Over Grade
Calculate the Expected Number of Periods for a Setup
Use Live Charts
Troubleshooting
Glossary
Evolution
You are here:
Other Tab Overview
Source file:
origin-blocks-setups-other.htm
The
Other
tab contains the following subtabs:
Grade Bins
Mill Classification
Engine Parameters
Was this page helpful?
Leave a comment (optional)
Submit
Evolution Index
Home
Getting Started
Getting Started with Evolution Projects
Creating a New Project
Opening an Existing Project
Interface Overview
Settings
Importing or Creating a Model
Evolution Cloud Service
Key Concepts
Models
Models in Evolution
Block Models
Block Models in Evolution
Importing a Block Model
Transforming a Block Model
Reblocking a Block Model
Using the Block Model Viewer
Maths Scripts for Block Models
Updating a Block Model Using External Data
Overview
Updating a Waste Dump
Updating a Block Pit
Adding Toe Blocks
Solid Models
Solid Models in Evolution
Importing a Solid Model
Transforming a Solid Model
Using the Solid Model Viewer
Maths Scripts for Solid Models
Dynamic Solids Pits
Dynamic Solids Pits in Evolution
Importing a Dynamic Solids Pit
Road Networks
Road Networks in Evolution
Importing and Modifying Road Networks
Using the Waypoint Editor
Viewing a Road Network
Exporting or Importing a Waypoint Collection as a JSON File
Road Mathematics
Creating a Waypoint Collection
Adding and Removing Waypoints
Creating Trucks
Simple Stockpiles
Scripts
Scripts in Evolution
Common Maths Scripting Rules
Maths Scripting Functions
Python Scripts for Block and Solid Models
Reporting
Pivot Reporting
Python Report Scripting
Phase: Stage Design Module
Phase Module Overview
Creating a Phase Model
Phase Tools
Strategy Workflow
Introduction to Strategy
1. Create a Setup
2. Configure the Setup
Strategy Setup Configuration
Process Setup
Process Setup Overview
Material Flow
Material Flow Overview
Pit Models
Crusher and Standard Process
Stockpiles
Beneficiation Group
Configuration
Stage and Process Precedence
Tonnage & Grade
Lithology
Targets & Economics
Targets & Economics Overview
Calendar
Configuration
Variable Costs
Incremental Costs
Capital Layout
Fixed Cut-Offs
Constraints
Constraints in Strategy
Stage Dependency
Stage Lag
Stage Bench Turnover
Sink Rate
Ore Exposure
Global Accumulation
Pit Accumulation
Stage Accumulation
Stage Availability
Process Accumulation
Process Blend
Stage Sink Rate
Waste Dump Availability
Stockpile Availability
Reporting
Reporting Overview
Reporting Fields
Breakdown Field
Model Analysis & MIK
Engine Parameters
Summary
3. Validate the Setup
4. Generate a Schedule
5. View the Schedule
6. Analyse the Schedule
Strategy Schedule Analysis
Schedule Report
Mining Sequence
Strategy Schedule Viewer
Origin Blocks Workflow
Introduction to Origin Blocks
1. Create a Setup
2. Configure the Setup
Origin Blocks Setup Configuration
Process Setup
Process Setup Overview
Material Flow
Configuration
Parcel Reporting
Objectives
Objectives in Origin Blocks
Blend
Material Movement
Equipment
Net Present Value
Min/Max Objectives
Calendar
Calendar in Origin Blocks
Targets
Staging
Staging Overview
Stage Release
Stage Lag
Bench Release
Mining
Constraints
Constraints in Origin Blocks
Maximum Active Benches
Stage and Waste Utility Dependency
Stage Bench Turnover
Stage Equipment
Stockpile Reclaim Availability
Waste Area Availability
Waste Area Dependency
Waste Area Required Tonnage
In-Pit Crusher Location Dependency
Other
Other Tab Overview
Grade Bins
Mill Classification
Engine Parameters
Viewer
Viewer in Origin Blocks
View Manager
Properties
Road Network
3. Validate the Setup
4. Generate a Schedule
5. View the Schedule
6. Analyse the Schedule
Origin Solids Workflow
Introduction to Origin Solids
1. Create a Setup
2. Configure the Setup
Origin Solids Setup Configuration
Process Setup
Process Setup Overview
Material Flow
Configuration
Parcel Reporting
Screening Stations
Objectives
Objectives in Origin Solids
Material Movement
Equipment
Blend
Net Present Value
Calendar
Calendar in Origin Solids
Targets
Mining
Constraints
Constraints in Origin Solids
Bench Accumulation
Global Accumulation
Global Process Accumulation
Pit Accumulation
Parcel Waste Destination Priority
Pit Region Availability
Pit Region to Waste Region
Process Accumulation
Sink Rate
Stage Accumulation
Stage and Waste Utility Dependency
Stage Availability
Stage Bench Turnover
Stage Dependency
Stage Equipment
Stage Sink Rate
Stockpile Reclaim Availability
Stockpile Redirect Availability
Waste Area Availability
Waste Area Dependency
Waste Area Rate of Rise
Waste Area Required Tonnage
Engine Parameters
Viewer
Viewer in Origin Solids
Dependencies
View Manager
Properties
Road Network
3. Validate the Setup
4. Generate a Schedule
5. View the Schedule
6. Analyse the Schedule
Epoch Workflow
Introduction to Epoch
1. Create a Setup
2. Configure the Setup
Epoch Setup Configuration
Process Setup
Process Setup Overview
Material Flow
Parcel Reporting
User-Defined Targets
Destination Priority
Resources
Resource Groups
Truck Fleet Assignments
Max Speed
Wait Times
Truck Payloads
Stockpile Productivity
Advanced Options
Calendars
Resource Definitions
Blend
Appointments
Task Sequence
Task Sequence Overview
Task Keys
Virtual Solids
Task Lists
Resource Allocation
Activities
Activities Tab Overview
Activity Sequence
Resource Productivity
Reporting Fields
Constraints
Constraints in Epoch
Global Accumulation
Process Accumulation
Region Accumulation
Waste Area Accumulation
Destination Rate
Source Proportion
Viewer
Viewer in Epoch
Road Network
Dependencies
Schedule Playback
Mining Direction
Solid Cuts
View Manager
Properties
Task Lists
3. Validate the Setup
4. Generate and View the Schedule
5. Analyse the Schedule
Epoch Schedule Analysis
Export End of Period Solids
Export End of Period Surfaces
Live Dashboard
6. Refine the Schedule
Tutorials
Scheduling Drill and Blast
Introduction
Step 1: Create Drill and Blast Groups
Step 2: Set Task Keys
Step 3: Set Dependencies
Step 4: Create Task Lists
Step 5: Fine Tuning
Step 6: Review the Schedule
Quick Reference
How do I?
Import Haul Network Attributes with Trolley Data
Stamp Period and Rank Back to Model
Use the Quick and Advanced Validate Functions
Calculate the Marginal Cut-Off Grade or the Cut-Over Grade
Calculate the Expected Number of Periods for a Setup
Use Live Charts
Troubleshooting
Glossary