Skip to main content
Maptek Account
Support
All Files
Home
Vulcan Quick Start Guide
Installation
Vulcan Installation and Configuration
Installing a Network Licence
FlexNet Licence Administrator
Borrowing a Licence from the FlexNet Server
Maptek Floating License Server (FLS)
Product Support
Technical Support
Office Locations
Copyright Notice
Troubleshooting
Getting Started
Introduction to Vulcan
Overview
Starting Vulcan
Accessing Help Topics
Different Methods for Starting Vulcan
Vulcan Menus
Setting Up Vulcan
Creating a Project File (dg1)
Primary Window
Colours
Patterns
Line types
Design Defaults
Desktop Icons
Viewing Design Work
Opening a Design Database
Selecting Layers
Using the Mouse
Keyboard Controls
Selecting Design Data
Viewing Data
Rotating the View
Saving Views
Full Screen Mode
Load View Toolbar
Looking From Different Points
Overview Window
Perspective Mode
Editing Design Data
Entering Design Data
Digitising
Indicate Mode
Snap to Objects
Smart Snap
Snap to Grid
Snap to Points
Property Editor
Fonts
Saving Your Work
Exiting Vulcan
Data Structures
Data Hierarchy
Design Files
Layers
Objects
Additional Data Organisation
Coordinate Points
Structuring Your Data
System Files Listed by Module
System Files Listed by Extension
Specification and Parameter Files
Database Management
Contents
ODBC Interface
Recovering a Database
Compressing a Database
Unlocking a Database
Scanning a Database
Repairing a Database
Restoring a Backup
Crash Reports
Toolbars
Overview
Advanced Object Label
Analyse
Angle Input
Animation
Bearing Input
Custom Cursor
Delete
Design
Digitise
Dragline
Dragline - Move Blocks
Draw by Hand
Drill and Blast - Create
Drill and Blast - Edit
Drill and Blast - Files
Drill and Blast - Report
Dump
Dynamic Volume
Effects
Expand
FixDHD (Fix strat from DB)
Gaussian Transformations
Geology Drilling
Geology Section
Grade Control - Display
Grade Control
Graphics
Grid
Grid Calc - Advanced
Grid Calc
Haulage
History
Insert
Keyboard Input
Load View
Look At (Look From Point)
Macro Control
Merge
Modify
Move
Open
Open Cut Design
Phase Design
Point Clouds
Predefined Solids
Primitives
Ramps
Relimit
RotateMode
Rsvute
Sequence
Slice
Standard
Status
Texture
Translucent Factor
UG Explosives
UG Ring Design
Visibility
ZoomTo
Menu Topics
File
Contents
New
Open
Design Files
Contents
Directory
List Files
Open
Convert
Layers
Contents
List
Load
Load All
Load By Polygon
Reload
Remove
Underlays
Contents
Overview
Load Layer
Remove Layer
Convert/Display Coloured Points
Convert To Object
Remove
Remove All
Symbols
Contents
Overview
New
Load
Save
Save As
Delete
Inherit Colour
Line Styles
Contents
Overview
New
Load
Save
Save As
Delete
Repeat Distance
Set Invariance
Remove Invariance
Sine/Cosine Wave
Convert
Contents
Overview
Block To Pexel
Image To PostScript
Save
Save Layer
Save Layer To
Load Screen
Save Screen
Archive
Load Archive
Load Recovered Layers
Plot
Plot Builder
Plot All
Batch Plotting
Plot File
Page Setup
Data Extent
Multiple Page Setup
Cutting Planes
Drawing Order
Display Scheme
Plot Elements
Plot Elements
Borders
Views
Gridlines
Gridlines
Absolute
Relative
Centreline
Plan/Section/Width
Title Block
Legends
User Notes
Scale Bars
North Points
Data Elements
Data Elements
Database Fields
Digitised Drafting
Grid Models
Triangulation Models
Surface Model Clipping
Block Model
Block Annotation
Block Selection
Examples
Plan with DGD Data
Plan with Border Style and DGD Data
Section with Border Style and Block Model
Rotated Plan with DGD Data
Section with Drilling and Triangulations
Section with Drilling and Assay Colour Bars
Section with Drilling and Paired Grid Surfaces
Flexed Section with Drilling and Paired Grid Surfaces
Plot Existing Files
Plot Edit
Contents
Overview
Load
Open Plot-Edit Window
Create
Sheet Template
Clip
Drafting Sheets
Contents
Overview
Drafting Sheet Builder
Load Drafting Sheet
View
Scale Bar
North Arrow
Title Block
Design Line
Permanent Text
Text Field
Plot Elements
Legend
Images
Drafting Page Size
New
Load
Save
Save As
Delete
Import
Contents
3d Dig
ASCII
Design Strings
Grids
Triangulations
AutoCAD (dwg, dxf, dxb)
Design Strings/Grids/Triangulations (dwg, dxf, dxb)
ICF Tables Setup
CSV (Databases)
Databases
Databases Update CSV
Synonym Assignment
Datamine
Block Models
Block Models (Reblocked)
Databases
Design Strings
Triangulations
DTED Elevation Data
Design Strings
Easimine
Block Models/Design Strings/Triangulations
Esri (shape, grid, tin)
Design Strings
Grids
Triangulations
Gemcom
Triangulations (ASCII)
Geocomp
Design Strings
Geosoft
Grids
Voxel
KML
Import KML Design Strings
LIDAR
LIDAR Data
Load ArcInfo ASCII Grid Using Reduce Method
Load ArcInfo ASCII Grid Using Decimate Method
Load Point Data Using Sampling Method
Load Point Data Into Layer
Micromine
Databases
Design Strings
MicroStation
Design Strings
MineSight
Block Models
Design Strings
Triangulations
Triangulations (ASCII)
Minex
Grids ASCII
Triangulations
Optech
Triangulations
Phodat
Design Strings
STL
Triangulations
Surpac
Design Strings (v1)
Design Strings (v2)
Triangulations
Whittle 4X
Block Models
Export
Contents
3d Dig
ASCII
Design Strings
Grids
Minex
AutoCAD (dwg, dxf, dxb)
Design Strings/Grids/Triangulations (dwg, dxf, dxb)
ICF Tables Setup
Triangulations
CSV (Databases)
Databases
Datamine
Design Strings
Triangulations
Easimine
Triangulations
Esri (shape, grid, tin)
Design Strings
Grids
Triangulations
Inventor
Triangulations
KML
Export KML Design Strings
Micromine
Design Strings
MicroStation
Design Strings (dgn v8)
NGRAIN
Block Model
Design Data
Grids
Triangulations
PDF
Block Model
Design Data
Triangulations
Pitboss
Design Strings (blast)
Design Strings (strat)
STL
Triangulations
Topcon
Trimble
Triangulations
Ventsim
Ventsim Design Strings
VRML
Block Models
Design Strings
Grids
Triangulations
Whittle 4X
Model
Opti Cut
Pit List
Colour Table
Contents
Colours
Save
Rename
Delete
Upgrade
Macro Create
Lava
Contents
Introduction
Running a Lava Script
Functions
Classes
Lava Scripting Support for VGS
Gantt Lava Scripting Functions
Lava Scripts for VGS Testing
GPAN
Example
Python
Python Script
Writing Python Scripts
Index of Python Class Libraries
Run Stored Procedure
Run Command
Quit Vulcan
Design
Overview
Contents
WinTab Digitiser
Contents
Overview
Attach Viewport
Detach Viewport
Set Up Transformation
Configure WinTab Context
Create
Contents
Layer
Point
Line
In Plane
Polygon
Paste Object
Polygon Textured
Rectangle
Grid
Arc
Ellipse
Arrow 2D
Arrow 3D
Spline
Symbol
Line draw by hand
Polygon draw by hand
Configure draw by hand
Create Text
Import Text
Create 3D Text
Import 3D Text
Features
Dimension
Contents
Line
Line Components
Radius
Angle
Arc
Attributes
Move
Swap Points
Mirror Horizontal
Mirror Vertical
Mirror Both
Colour
Reposition
Construction Points
Contents
Overview
Distance
Equal Parts
Intersect
Digitise
Z Cut
Compass
Ruler
Insert By Distance
Insert By Point
Insert By Line
Delete
Delete All
Selection Criteria
Contents
Select By Polygon
Create Boundary
Enable Boundary
Disable Boundary
Group
Ungroup
Enable
Disable
Metadata
Contents
Overview
Create/Edit Specification
Assign Metadata
Delete Metadata
Get Object Metadata
Setup Display Attributes
Apply Display Attributes
Reporting
Templated Attributes
Contents
Edit DGD Templates
Assign Data
Get Object Data
Colour By
Visible By
Contents
Delete Attributes
Edit Resource Templates
DGD Template to Resources
Resource Template to DGD
Templated Attributes Expressions
Layer Edit
Contents
Identify
Name
Copy
Delete
Transfer
Unify
Make Current
Multiple Object Filter
Object Edit
Contents
Identify
Delete
Delete by Poly
Clip by Multi- Poly
Clip by Solid
Clip by Triangulation
Trim
Drag
Offset
Split
Intersection Split
Paste
Join Point
Join Lines
Coalesce
Reverse
Reverse Advanced
Sort
Consistent
Point Name
Connection
Cross Check
Grid Snap
Filter
Register
Z Value
Register by Plane
W Tag
Grade
Delete End Point
Explode
Transform
Colour by Gradient
Polygon Edit
Contents
Area
Expand
Boolean
Boolean by Plane
Build
Morph
Partition
Impose
Pairs
Radii
Boundaries
Tessellate
Skeleton
Network
Remove Crossovers
Delete Bridges
Point Edit
Contents
Resequence
Move
Move To Intersection
Multi-Move Points
Grid Snap
Name
Z Edit
W Tag
Weight Point Values
Symbol
Colour By Attribute
Remove Attribute Colouring
Delete
Delete Duplicate
Disconnect
Connect
Cut
Append
Best Fit
Move By Distance
Move By Point
Move By Line
Point Insert
Contents
Insert
Replace String
Dynamic Replace String
Multi-Replace String
Plane Insert
Insert At Intersection
Multi-Insert at Intersection
Insert At Distance
Interpolate
Measure
Apply Curve
Intersection At Elevation
Intersection With Triangulation
Attribute Edit
Contents
Name
Description
Group
Ungroup
Group By Attribute
Value
Close Polygon
Open Polygon
Feature
Graphics
Segment Colour
Attribute to Value
Attribute Editor
Along Line
Assign W Tag
Edit W Tag
Clear W Tag
Label W Tag
Interpolate W Tag
Create/Edit Primitives
Primitive Visibility
Remove Primitive
Polygon Texture Primitive
Apply Spline
Remove Spline
Insert Points on Spline
Relimit
Contents
By Distance
To a Point
To a Line
Multi-Line Relimit
To a Plane
To Surface
Transformation
Contents
Translate
Rotate 2D
Rotate 3D
Rotate Arbitrary
Scale
Calculate
Matrix
Mirror
Geographic
GDA Conversion
Text Edit
Contents
Edit
Move
Drag
Substitute
Delete
Text To Point
Attributes
Font
Font Size
Angle
Text Rotate
Colour
Convert to 3D Text
Text 3D Edit
Contents
Edit
Attributes
Colour
Convert to 2D Text
Arrow Edit
Contents
End Points
Attributes
Colour
Line Type
Line Style
Contents
Apply Style
Remove Style
Symbolise Line
Symbol At A Point
Symbolise Points
Unsymbolise Points
Feature Edit
Contents
Default
Feature Editor - Layer Object Name
Feature Editor - Object Attributes
Feature Editor - Point Attributes
Feature Editor - Digitising Attributes
Intelligent Objects
Intelligent Objects Editor
Open Specification
Database
Labelling
Types
Save Specification
Control Points
Map Section To Plan
Data Posting
Undo
Redo
View
Contents
Overview
Visibility
Contents
Visible
All Visible
Shadow
All Shadow
Invisible
All Invisible
Freeze
Freeze All
Design Visibility
Triangulation Visibility
Grid Visibility
Visible By Feature
Shadow By Feature
Invisible By Feature
Section Shadow Visible
Section Shadow Invisible
Change View
Contents
Set View
By Object
Section
Section Strat
Vertical Exaggeration
Walk
View Point Walk
Look From
Look
Flyby
Windows
Contents
Open
Create
Delete
Edit
Select
Fit Layer
Shaft View
Contents
Overview
Create
To Shaft View
From Shaft View
Animation
Contents
Overview
Create
Frames
Load
Run
Path
Create Section
Section Definition
Primary Section Shadows
Delete Section
Move Sections
Save View Settings
Switch To East Section
Switch To North Section
Switch To Plan Section
Sections Panel
Analyse
Contents
Overview
Details
Contents
Coordinate
Distance
Perpendicular/Shortest Distance
Along String
Total Length
Area
Centroid
Polygon Area
Full
Curvature
Strike/Dip
List
List Objects
Find Objects
Layer Range
Angle Distance
Grid
Contents
Apply
Properties
Geographic
UTM Grid
Remove
Label
Contents
Point Label
Point Label to Text
Object Label
Advanced Object Label
Annotate String Z Value
Underlay Label Colour
Remove
Attribute Data
Contents
Inquire
Create
Modify
Delete
External Data
Contents
Set Up
Inquire
Set Up Export
Export from Selection
Export from Point
Data Analyser
Overview
Preferences
File
File Menu
Creating Project Templates
Data
Replacing a Data Source
EDA Panels Selection
EDA Panels Transformation
EDA_Panels_Weight
Domain Manager
Downhole Prompt
The Database
Data Explorer
Explorer Visibility Pane
Chart Explorer
Custom Domains
Specify Direction Grid
Apply Filter to Data
Applying a Weighting Scheme
Log or Gaussian Transformations
Viewing in Vulcan
Stats
General Statistics
Histogram
Define Bins for Histogram
Boxplot
Cumulative Frequency
Scatter / Line Plot
QQ [Quantile - Quantile Plot]
PP [Probability - Probability Plot]
Correlation Matrix
Pie Chart
Swath Plot
Contact Profile
Data Spacing
Analysis
Grade Capping
Variography
Creating a New Variogram
Creating a New Fan Variogram
Creating a New Ortho Variogram
Creating a New Cross Variogram
Creating a Cross Orthogonal Variogram
Creating a New Blockmodel Variogram
Editing and Modelling a Semivariogram
Editing and Modelling a Fan Variogram
Editing and Modelling an Orthogonal Variogram
Editing and Modelling a Cross Variogram
Creating a Cross Orthogonal Variogram
Editing an Existing Blockmodel Variogram
Specify Single Direction for Block Model Variogram
Specify Multiple Directions for Block Model Variogram
Save and Load Variogram Properties
Downhole Variography
Autofit
Export
Chart Grid
Tab View
Analyse EDA Panels Export
Connectivity
EDA_Ribbon_Connectivity
Visualization
Visualization
Charts
Tab View
Grid View
Multiple Charts of Mixed Types
Exporting Charts
Statistics
Contents
Overview
Advanced Statistics
Open Specification
General Setup
Data Elements
Global Conditions
Graph Type
Output Display
Display
Output
Terminology
Legend Editor
Draw Legend
Display Legend
Model
Contents
Overview
Grid Mesh Surfaces
Contents
List
Load
Remove By Name
Create Simple
Mask
Invert Mask
Unmask
Contour
Drape
Min/Max
Patch
Set Value
Node Edit
Triangulate
To Object
Create Mapfile
Remove
Triangle Files
Contents
List
Rename
Load
Load by Location
Display by Colour
Properties
Remove by Name
Remove by Location
Remove
Triangle Utility
Contents
Relimit
Intersect
Cut
Cut By Lines
Merge
Poly Boolean
Boolean
Multi-Boolean
Delete Internal Walls
Fill Holes
Repair
Auto Expand
Expand
Smooth
Display Colour Scheme
Create Selection File
Append
Check
Minimum/Maximum
Register
Fault
Strip
Footprint
Shrink Wrap
Plane
Bench Profile
Section Profile
Section by Line
Find Path
Scale
Translate
Rotate
GDAÂ Conversion
Triangle Surface
Contents
Create
Two Polygons
Grid Mesh
Interactive Creator
Relimit by Polygon
Relimit by Solid
Surface Area
Triangulation Volumes
Add
Subtract
Colour by Orientation
Offset Distance
Extrapolate Points
Extrapolate Triangulation
Extrapolate Two Triangulations
Vertex Z Edit
Move Vertex
Add Vertex
Delete Vertex
Insert Triangle
Delete Triangle
Swap Triangles
Arithmetic
Thickness Between
Triangle Solid
Contents
Create
End Plate
Tri Polygons
Split
Auto Split
Split by Horizons
Close Solid
Delete
Triangle Delete
Repair Solid by Voxelation
Shells (Triangulation Solids)
Surface Levels
Polygons
Contents
Split Underground Drive
Volume
Reserves
Differential Volumes
Create Sphere
Troubleshooting Guide
Triangle Edit
Contents
Overview
Analyse Triangles
Analyse Vertices
Problem Areas
Dump
Filter
Simple Outlier
Small Triangles
Clip By Polygon
Snap Vertices
Connect Vertices
Delete Crossing Triangles
Interpolate
Extrapolate
Line Split
Add Vertex
Delete Vertex
Flip Triangles
To Grid Mesh
From Triangles
Update With Points
Triangle Attributes
Attributes
Colour by Attribute
CSV Import Attributes
Export Attributes
Triangulation Visibility
Remove Attributes
Edit Attributes
Image Registration
Contents
Overview
Create or Open
Close
Add Point
Move Point
Delete Point
Clear All Points
Create Bounding Triangulation
Loading into 3D Window
Remap Loaded Triangulation
Import Georeferenced Image
Primitives
Contents
Create/Edit Primitives
Triangulate Primitive
Contouring
Contents
Contour
Annotate String
Delete Object
Delete Point
Move Point
Connect
Disconnect
Replace
Recondition
Graded Contour
Remove
Modflow Grid
Contents
Overview
Edit Row Height
Edit Column Width
Insert Row
Insert Column
Delete Row
Delete Column
New Entry
Remove
Merge Surface Models
Grid Calc
Contents
Introduction
Overview
Grids
Mapfiles
Naming and Referencing Grids
Naming and Referencing Masks
Modifying Mask Files
Grid Calc Commands
MASK () Function
Mask Modes
Coordinate Window/Range
Starting Grid Calc
Model Validation Techniques
Streamlined Stratigraphy
Integrated Stratigraphic Modelling
Overview
Validate Data
Validate Overview
Validation Specifications
Select Database
Collar Checks
Unique Collar Location
Collar on Surface
Downhole Checks
Empty Table
Total Depth
Overlapping Intervals
Increasing and Decreasing
Maximum Variation
Unique Values
Sequence
Derived Value
Along Record Checks
Field Sum
Individual Field Checks
Minimum and Maximum
Translations
Case Of
Mandatory
Expression
Report
Save and Run
Fault Solid Creator
Overview
Base Solid
Set Up
Fault Design Data
Fault Surfaces
Edit
Preview
Fault Surface Creator
Overview
Database
Triangulations
Extents
Results
Interpolate Drillhole Data (FixDHD)
FixDHD Overview
Drillhole Database
Drillhole Scheme
Drillhole Selection
Horizons
Horizon Control
Lithology
Reliability
Interpolation Control
Partings
Limit Strings
Survey Data
Fault Zones
Output
Preferences
Model Stratigraphy
Model Stratigraphy Overview
Load Specification
Extents
Horizons
Data Source
Database
Drillhole Selection
Additional Design Data
Faulting
Zones
Throw
Crest and Toe
Blocks
Method
Seam Existence
Cropping
Masking
Save
Composite and Model Qualities
Create HARP Model
Create HARP Model Overview
Update HARP Model Qualities
Update HARP Model Overview
Load Specifications
Horizons
Qualities
Save
Quality and Mining Parameters
Quality and Mining Parameters Overview
Load Specification
Quality Parameters
Mining Parameters
Output
Run of Mine Model
Run of Mine Model Overview
Load Specification
Horizons
Options
Output
Strip Ratios
Strip Ratios Overview
Load Specification
Horizons
Options
Output
Export Block Model Surfaces and Solids
Overview
Load Specification
Block Model
Horizons
Average Qualities
Save
Coal Plot Batcher
Coal Plot Batcher Overview
Specification
Template Details
Seams
Qualities
Output
Compare Strat Models
Create Surface
Create Surface
Extents
Data Source(s)
Faulting
Faulting
Zones
Throw
Crest and Toe
Blocks
Method
Masking
Save
Create Multiple Surfaces
Grid Calculator
Mapfile Generation
Mapfile Generation
Drillhole Database
Drillhole Scheme
Drillhole Selection
Horizons
Lithology
Output
Preferences
Edit Modelling Defaults
Contents
Project Defaults
Create Grid Specifications
Access Grid Specifications
Save Grid Specifications
Horizon Table
Splits Definition
Strata File
Define Method
Define Variables
Access Design Database
Close Design Database
Grid Display Defaults
Data Display Defaults
Clear Replay File
Grids
Contents
Load/Calculate Grid
Triangulate Grid
Save Grid
Define Level Grid
Transform Grid
Re-interpolate Grid
Import ASCII Grid
Close All Grids
Data
Contents
Load Design
Pick Design
Load Mapfile
Load DEM
Load Triangulation
Select Triangulation
Transform Data
Filter Data
Trend
Filter Grid
Data Statistics
List
Clear Data
Tri Parameters
Clear Triangles
Dump Triangulation
Faults
Contents
Load Fault Strings
Load Fault Zones
Set Fault Zones
Query Fault Zones
Model
Contents
Grid Model
Triangulate
Save Triangulation
Smooth
LSQ Smooth
Derivatives
Scale
Verify Model
Clip Grids
Grid Fill
Mask
Mask Multiple
Unmask
Contents
Macros
Contents
Overview
Invoke Macro
Create Stacking Macro
Modelling Table
Create Model Table Macro
Edit Macro
Save Macro
Composite Models
Contents
Create Ratio and Burden Grids
Define ROM Quality Parameters
Define ROM Mining Parameters
Create Run Of Mine Model
Grid Query
Contents
Defaults
Header
Statistics
Inquire
Maximum
Minimum
Type
Value
Cell
Grid
Register
Histogram
Area
Contour and Limit Generation
Contents
Contour
Spline Contour
Create Polygon Limits
Display
Contents
Dynamic Display Grid
Static Display Grid
Display Data
Display Triangulation
Display Grid Scale Bar
Remove Underlay
Clear All Grid Calc Underlays
Preferences
Start Console
Rsvute
Contents
Overview
Starting Rsvute
Simple Reserving Procedure
Notes on Ratio and Overburden Calculations
Files
Contents
Select Polygons
Pick Polygons
Highlight Polygons
Deselect Polygons
Deselect All
Save Sequence
Load Sequence
No Table
Table
Save Table
Save Defaults
Load Defaults
Invoke Macro
Save Macro
Edit Macro
Reserves
Contents
Load Derived Variables
Reset Selection
Report Reset
Report Reserves
Project Reserves
Property Reserves
Block Reserves
Period Labels
Define Periods
Target
Deselect Target
Query
Contents
Model
Defaults
Statistics
Tools
Contents
Selection
Reserve
Direction
Selection by Rubberband
Reserve by Rubberband
Direction by Rubberband
Setup Defaults
Load Specification
Horizons and Masking
Variable Parameters
Derived Variables
Report
Units
Reload Model
Display Polygon
Display Quad Tree
Remove Underlay
Clear all Rsvute Underlays
Block
Contents
Overview
Open
Close
Header
History List
Construction
Contents
Overview
New Definition
Open Definition
Display
Create Model
Viewing
Contents
Overview
Inquire
Blocks
Contour
Grade Shells
Pits
Intersect Triangle
Slice
List Slice
Load Slice
Remove Slice
Colour
Image Slice
Load Image
Modify Dynamic Model
Load Dynamic Model
Display Regular Model
Remove
Manipulation
Contents
Overview
Edit Cell
Calculate
Mine
Flag 2D Polygon
Polygon Flag
Triangulation Flag
Edit Script
Edit Script
Maptek Evolution Model
Execute Script
CommandEditor
Add models
Add/remove variable
Add text variable
Advanced Grade/Tonne Report
Assign to model
Check duplicated
Classic to extended convert
Command List
Commands
Convert to pexel image
Create block model
Create regular model from ASCII
Create strat from grids
Create strat from triangulations
Create subblocked model from ASCII
Delete blocks
Edit variable attributes
Estimation ID
Export model to ASCII
Export to CSV
Extract Cells
Flag by Triangulation
Grade Estimation
Grade shells
Grade Simulation
Header to file
Implicit Modelling
Index model
Intersect with triangulation
Mine blocks
Model from CSV
Pit optimiser analysis
Pit Optimiser
Pit Optimiser Viewer Output
Reblock model
Regularise model
Reserve report
Reset to defaults
Run Script
Command Editor
Stope Optimiser
Update from ASCII
User commands
Add Variable
Delete Variable
Edit Variable
Edit Translation Table
Edit Description
Edit Block
Reset to Defaults
Translate
Rotate
Index
Contents
Assign Values
Distance
Extract Definition File
Categorical Smoothing
Transfer
Contents
Overview
Import ASCII
Contents
Export Mask
Export to Drilling
Addition Parameters
Regularise Model
Tri-Block Parameters
Delete Blocks
Extract Blocks
Convert Classic to Extended
Model to CSV
CSV to Model
Archive
Load Archive
Coalesce
Reserves
Contents
General
By Polygon
Cubic Reserves
Reserves To Attributes
Advanced Reserves Editor
Process Dump File
Advanced Grade/Tonne Report
Category Definition
Catagory Populations
Category Reserves
Dynamic Reserves
Variography
Contents
Overview (Gslib)
Variogram Model Types
Directional Variogram
Directional Variogram Editor
Basic Interface
Directional Variography
Samples Database
Sample Database
Select using Numeric tag
Select using Character tag
Select using Solid triangulations
Select using Field restrictions
Variograms directions
Variograms type
Directional Autofit
Variograms fitting
Constraints
Save and Run
Create Variogram
Cube
Cube Editor
Cube Interactive
Cube Multi Display
Block Model Varoigram
Auto Fit
Display
Multi Display
Output
Edit
Zonal
Remove
Unfolding
Contents
Create Unfolding Model
Create Anisotropy Model
Grade Estimation
Overview
Univariate Estimation Editor
Contents
Validation Estimation Editor
Post Estimation
Herco Analysis
Kriging Neighborhood Analysis
Run
Batch
Codes
Explain
New Estimation File
Open Estimation File
Run Estimation
Run Estimation Multi
Estimation Summary Report
Rotation Angles
Display Ellipsoid
Remove Ellipsoid
Delete Estimation ID
Gaussian Transformations
Contents
Normal Score
BM Normal Score
Stepwise Gaussian
BM Stepwise Gaussian
Normal Score Back
Stepwise Gaussian Back
Simulation
Contents
Sequential Gaussian
Multi-Gaussian
Sequential Indicator
Contents
Variogram Average
Validate Simulation
Post Simulation
Pit Optimiser
Contents
Edit
Run
Batch
Viewing
Floating Cone
Cut Off Grade Optimiser
Overview
COG Optimiser Editor
C.O.G. Optimiser Editor
Open Specification
Optimisation
Reserves
Financials
Products
Combinations
Capacities
Reports
Charts
Save & Run
Sequencing Accumulation and Reporting
Introduction
Specification File
Specification File
Periods
Block Models
Products
Process Plant
Tonnage and Bench
Sequence
Filter Selection
Target
Region Selection
Output Triangulation Options
Accumulation
Accumulation
Reporting
Reporting
Display Blocks
Display Triangulations
Generate Triangulations for Period
Solids Animation
Save
Grade Control Optimiser
Grade Control Optimiser
Grade Control Polygons
Contents
Whittle 4D
Contents
Overview
Set Up
Edit fd.ini
Edit Whittle Parameters
Export Model
Export Polygon
Import Results
Perform Run
Re-block
Create Arcs
Optimise
Print Blocks
Analyse Results
Utility
Edit Model Parameters
Iroad
Contents
Introduction
Data Structure
Quick Reference
Terminology
Files
Contents
Overview
Load
Remove
Set Up
Topography
Subsurface
Bulking Factor
Haul Costs
Edit
Contents
Intersection Points
Design Alignment
Long Section
Balance
Mark
Road Sections
Conditional Sections
Apply Sections
Connect Sections
Design Superel
Define Bridge
Topography
Subsurface
View
Contents
Plan
Long
Road
Drive
Quantities
Contents
End Area
Triangle
Mass Haul
Balance Line
Bulking Factor
Haul Costs
Plotting
Contents
Label
Sections
Survey
Contents
Display Stations
Remove Stations
Radiate
List
Survey
Contents
Overview
Surveying
Contents
Overview
Set Up
Create
Upload
Download
Convert
Edit
Resection
Reduction
Coordinates
Traverse
Edit Codes
Lava
Import Vulcan Field File
Create Station Library
Edit Station Library
List Station Library
Maintain Station Library
Display Stations
Remove Stations
Radiations
Adjustment
List Survey
Create Triangulation
Load Triangulation
Contour
Remove Triangulation
Blast Setout
Contents
Overview
Load
Create Survey
Report Survey
Edit Ticket
Label On Ticket
Label Off Ticket
Survey Volumes
Contents
Overview
Working Section
Create Section
Insert Section
Delete Section
Generate Profile
Area
Volume
Part Volume
Plan View
Section View
Create Triangulation
Load Triangulation
Contour
Remove Triangulation
UG Survey
Contents
Overview
Traverse
Traverse By Single
New Traverse
Radiations
Report Offsets
Laser Offsets
Create UG Drive
Create Solid
Create Survey Triangulation
Overview
Open
DGD and Layer
Floor objects
Back objects
Save
Build 3D Drive
Generate UG Drive Strings
Over/Under Break
Transformations
Contents
Overview
Lat/Long To XYZ
XYZ To Lat/Long
UTM To Lat/Long
Set Up Local
Local To UTM
Geology
Contents
Introduction
Drilling
Contents
Overview
Open Database
Load Drillholes
Remove Drillholes
Multiple Trace Display
Selection Filter
Report Filter
Run Report
Flag
Register
Model
Mapfile
Bench Plans
Identify
Label On
Multi-Label On
Multi-Label Properties
Label Off
Radius Labelling
Remove Labels By Radius
Toggle Disc Display
Colour
Composite
Intersect
Selection Properties
Data Tips
Load Structures
Load Desurvey
Edit Desurvey
Report Desurvey
Drilling Utilities
Contents
Overview
DB Record Definition
Horizon List
CoreViewer
Check Drillholes
Create/Modify Locate
Run Locate Definition
Delete Locate Definition
Synthetic Holes
Mapfile Build Macro
Macro Definition
Database
Record
Horizon
Standard Mapfile
Horizon Criteria
Mapfile Parameters
Composite Mapfile
Variable Selection
Composite Parameters
Mapfile Run Macro
Drillhole Planning
English Log Translation Setup
English Log Generation
Specifications
Database
Schema
Hole Selection
Report Setup
Headings
Header Tables
Interval Table
Footer Tables
Output Options
Plot Available Pattern Table
Coal Borehole Graphics Pattern Definition
Coal Borehole Graphics Specifications
Coal Borehole Graphics Plot
Drilling Section
Contents
Display Settings
Create Section
Create Grid Section
Load Section
Save Section
Reverse View
View Next Segment
Apply Display Settings
Add Hole
Remove Hole
Align Holes
Reset Holes
Database Correlation
Clear All Database Correlations
Grid Correlation
Clear All Grid Correlations
Select Intervals
Select Intervals by Field
Select Bore
Select All
Deselect Bore
Deselect All
Edit Intervals
Save Edits
Drillhole Planning
Contents
Evaluate Drill Density
Create Drill Targets
Create Drillholes
Edit Drillholes
Reporting
Deviation Calculation Manager
Drill Rig Setup Specification
Cost Estimation Specification
Reposition Hole
Drillhole Optimiser
Contents
Drill Rigs Library
Drillhole Optimiser Editor
Downhole Geophysics
Contents
Interactive Editor
Overview
Geophysical Settings
Geophysical Settings
Data Source
Trace Selection
Lithology
Window Settings
Open Window
Import LAS Files
Edit Trace Specifications
View Traces
Label Traces
Remove
Remove All
Geophysics
Contents
Import From DB2
Edit and Display
View Traces
Remove
Remove All
Load
Rename/Flip Traces
Depth Conversion
Null Value
Convert
Generate
Invoke Macro
Save Macro
Edit Macro
Fault Manipulation
Contents
Overview
Projection
Generate Fault Mask
Surface Projection
Dynamic Edit
Grid Reserves
Contents
Overview
In Situ
Reserves
Bench
Resource Polygons
Compositing
Contents
Compositing
Run
Selection
Display
Remove
Sampling
Contents
Overview
Open Database
Load
Edit Sample
Remove
Check/Remove Duplicates
Colour
Identify
Annotation On
Annotation Off
Contour
Symbols On
Symbols Off
Flag Samples
Flag Samples
Samples Database
Triangulation
Block Model
Polygon
Script
Cell Decluster
Database Drift Analyser
Database Drift Analyser
Samples Database
Select Using Numeric Tag
Select Using Character Tag
Select Using Field Restrictions
Select Using Solid Triangulations
Block Model
Block Selection
Define Moving Window
Output
Vulcan Options
Excel Options
Contact Profile Analyser
Overview
General
Samples Database 1
Select Using Numeric Tag
Select Using Character Tag
Select Using Field Restrictions
Select Using Solid Triangulations
Samples Database 2
Select Using Numeric Tag
Select Using Character Tag
Select Using Field Restrictions
Select Using Solid Triangulations
Output
Vulcan Options
Excel Options
Save & Run
Multivariate Transformation
Overview
Forward Transformation
Numeric Tag
Character Tag
Triangulation
Field Restrictions
Report
Backward Transformation
Block Selection
Import Points
Import Attributes
Export ASCII
Setup Display
Open Scheme
Custom Database Format
Sample Display Attributes
Sample Restrictions
Select Using Numeric Tag
Select Using Character Tag
Select Using Solid Triangulations
Select Using Field Restrictions
Labelling
Channel Sampling
Contents
Overview
Open Database
Datasheet
Location
Attributes
Associate Channel
Move Channel
Rotate Channel
Rotate Channel Dip
Rotate Channel Bearing
Load Channel
Identify
Annotation On
Annotation Off
Composite
Remove Samples
Implicit Modelling
Implicit Modelling Editor
Overview
Open Specifications
Parameters
Samples Database
Select Using Numeric Tag
Select Using Character Tag
Select Using Solid Triangulations
Select Using Field Restrictions
Block Model
Domains
Polygons
Advanced
Geological
Pre Drilling Process
Synthetic Drillholes
Implicit Solids
Steep Horizon Modeller
Overview
Database
Horizons
Design Data
Data Extent
Method
Relimit
Triangulations
Block Model
Save Points
Change Log
3D Geological Sculpting
Washability
Contents
Overview
Setup
Contents
Source Database Setup
Delete Source Database Setup
Analyse Washability Data
Standardisation Settings
Delete Standardisation Settings
Waste/Missing-Interval Defaults
Delete Waste Defaults
Import/Export Custom Settings
Product Graph Settings
Standardise Tables
Generate Models from Standardised Tables
Open Generated Models Group
Interrogate Generated Models
Report from Washability Table
Combine Washability Tables
Close Models Group
Delete Models Group
Import Table
Export Table
Geotech
Contents
View
Contents
Overview
Primary
Stereonet
Rose Diagram
Display
Contents
Overview
Open Database
Set Up 3D Display
Load To 3D
Remove From 3D
Set Up Stereonet
Load To Stereonet
Remove From Stereonet
Set Up Rose Diagram
Load To Rose
Remove From Rose
Set Up Multiple Rose Diagrams
Load To Multiple Rose
Remove From Multiple Rose
Set Up Tadpole Display
Load To Tadpole
Remove From Tadpole
Set Up Stickplot Display
Load To Stickplot
Remove From Stickplot
Analysis
Contents
Overview
Assign
Contour
Create
Create Triangulation Plane
Daylight Windows
Group
Ungroup
Slope
Transfer
Identify
Highlight
Zone
Annotate
Utilities
Contents
Overview
Database Import
Convert
Annotation On
Annotation Off
ASCII Import
ASCII Export
CSV Export
Edit Codes
Edit Structures
Data Entry Setup
Digitise
Select
Line
Edit
Delete
Plot
Plot
Using an Existing Drafting Sheet
Using a Default Template
Map Image to Drillhole
Section
Contents
Overview
Set Up
Open Working Layer
Close Working Layer
Create Section
Create Profile
Create Slice
Strat Profile
Surface Profile
Section View
Plan View
Section Visibility
Profile Visibility
Analyse
Axes
Annotate
Rename Section
Delete
Edit Point
Open Pit
Contents
Introduction
Open Cut Design
Contents
Flag Toe/Crest String
Tolorence
Assign Berm/Batter Values
Condition String
Project String
Shadow Tool
Berm String
Auto Pit
Incline
Multi Incline
Pairs
Toes and Crests
Update Toe
Blocks
Interactive Cut Planner
Cut Reporting
Progress Maps
Dump Design
Rehab Design
Pit Topography
Update Topography
Define Angles
Planes
Move Pit/Dump Wall
Relimit
Make Mask
Phase Generator
Performance by Phase-Bench
Compliance
Sawtooth
Integrated Stratigraphic Planning
Create Pit/Highwall Surfaces
Pit Topography
Split Pit Setup
Split Pit
Clip Solids
Update Solids
Contents
Triangulation Visibility
Export Triangulation Attributes
Schedule Solids
Overview
Mining Solids
Mining Blocks Set up
Mining Blocks Edit Polygons
Ming Blocks Create
Rename Blocks by Ramp Distance
Ramps
Contents
Overview
Conventions
Problem Solving Guide
Design Pit/Dump
Simple
Advanced
Highwall
Assign Berm/Batter values
Graphics Toe/Crest/Road
Visibility Toe/Crest/Road
Condition String
Build Road
Insert road Pit/Dump
MKRD
Road Line
Cut and Fill Roads
Contents
Solid Ramp
Talpac Export
Talpac Start
Phase Design
Contents
Phase Design
Pit Diference/Union
Triangulate/Reserve
Pit Layout
Contents
Overview
Create Strip and Blocks
Offset Strips
Fan Strips
Crop Strips
Slice Strips
Block Layout
Join
Split
Limit Strip/Block
Naming
Reverse
Terrace Mining
Contents
Set Up
Specification
Run Reserves
Report
Benching and Batters
Contents
Overview
Set Up
Direction
Toggle Marks
Marker Size
Change Wall
Reverse Wall
Create Macro
Edit Macro
Assign Macro
Inquire
Auto Project (Mesh)
Auto Project
Manual Project
Seed From Wall
Block from Wall
Block Number
Solids from Projections
Section
Map File
Annotate
Horizon Legend
Horizons Visibility
Blocks Visibility
Batvol
Contents
Overview
Specification
Run Batvol
Inquire
Report
Plot RIN Data
Vertical Reserves Specification
Run Vertical Reserves
Dump File Reporting
Contents
Create from RIN
Reports
Page Setup
Tables
Save and Report
Pit Volumes
Contents
Create Sections
Insert Sections
Create Profiles
Working
Volume
Dragline Spoil
Dragline Surface
Bench Volumes
Haulage Profile
Contents
Overview
Truck Library
Build Route Network
Route Cycle Estimation
Model Route Calculation
View Bench
Contents
Section Design
Contents
Overview
Working
Create Sections
Insert Sections
XS On Lsection
Strat Profiles
Surface Profiles
C&F Volume
Section View
Plan View
Long Section View
Stack Sections
Axes/Grid
Template
Cut & Fill
Annotate
Range Diagram
Monitoring
Contents
Data Mapping
Display Settings
Select Data
Deselect Data
Identify
Annotate
Filter
Report
Export
Model
Dozer2000
Contents
Convert Files
Create/Edit Plan File
Create/Edit Vehicle File
Dig Limits
Contents
New Entry
Edit
Display
Run
Script
Oilsands Options
Contents
Total Volume in Place
Block Area Averaging
Block Selection
Dilution Modelling
Ring It
Automated Pit Designer
Strategic Designer
New Pit Design
Modify Pit Design
Evolution
Grade Control
Contents
Setup
Define Data Sources
Grade Control Database Setup
Specifications
Blast Header
Blast Solid
Blast Boundary Strings
Grade Block
Grade Block Solid
Options
Blast Holes
Reconciliation
Face Points
Boundary String Triangles
Samples Source Setup
Data Source Correlation
Calculation Rules
Calculation Rules General Help
Assignment Rules
Block Model Weight Rules
Estimation ID
Hole Weight Rules
Reconciliation Rules
Display Configuration
Material Report Setup
Preferences
Validate Current Specifications
Convert Specifications
Legacy Blast Solids Validation
Load Specifications
Save Specification
New Blast
Save Blast
Save Blast As...
Load Samples
Load Blast
Remove Blast
Set Current Blast
Define Blast Solid
Solid Triangulation
Surfaces
Levels
Dynamic Reblock Blast
Polygonal Blast Generation
Create Grade Blocks
Create Grade Blocks
Lines/Polygons
Triangulations & Whole Blast
Reblock Blast
Edit Grade Blocks
Edit Blast Holes
Blast Hole Selection Criteria
Edit Blast Holes Table
Reposition Grade Block Label
Delete/Replace User Polygon
Import Blast Holes
Source
CSV Column Mapping
Import Options
Select Holes to Import
Import Grade Block Solid
Blast Report
Create Bench Plan
Blast Selection Parameters
Select Blasts
Blast Selection
Grade Block Display
Grade Block Data
Reconciliation Grade Block
Reconciliation Block Model
Design Data
Material Report
Export Data
Triangulations
Design Objects
Underground
Contents
Introduction
Coal Development
Contents
Overview
Open Mine Workings
Graphical Attributes
Feature Visibility
Create Heading
Create Crosscut
Convert To Heading
Convert To Crosscut
Delete Drivage
Define Panel Type
View Panel Type
Edit Definition
Delete Definition
Create Panel
Modify Panel
Delete Panel
Pillars/LT Outlines
Area
Roadway Blocks
LS/SW Pillar Convert
Create Outline
Combine Blocks
Clip Blocks
Delete Blocks
Coal Reserves
Contents
Overview
Open Mine Workings
Geology Setup
Project
Reserve Setup
Run Reserve
Delete Projected
Development
Contents
Overview
Set Up
Automatic Ramp
Automatic Ramp Overview
Open Specification
Constraints
Block Model
Exclusion Zones
Primitives
Reserves
Interactive Edit Ramp
Level Layout
Centre Line
Cross Cuts
Wall Outline
Merge Walls
Union Walls
Project Backs/Floors
Generate UG Drive Strings
Apply Curve
Corner Peel
Costing
Define Ring
Expand Ring
Partial Gradient
Information
Model Backs/Floors
Point(s) Annotation
Line(s) Annotation
Analyse
Contents
Cost Benefit Analysis
Global Gradient
Drill Hole Warning
Proximity Alert
Find Entry Point
Stope Analyser
Stope Optimiser
Overview
Open Specification
Input
Restriction
Block Selection
Output
Verifications
Stope Framework
Dimensions
Optimisation Control
Cutoff
Slice Method
Slice Method Slice Definition
Slice Method Stope Geometry
Slice Method Post Processing
Section Method
Section Method Slice Definition
Section Method Stope Geometry
Section Method Post Processing
Restrictions
Prism Method
Risk
Explain
Over/Under Break
Stope Design
Stope Design menu contents
Overview
Directory
Open
Create Stope
General Reserves
Backfill Planning
Mine
Ring Design
Contents
Overview
Create/Edit Specification File
Edit Display Preferences
Templated Ring Design
Create/Edit Database Design
Create/Open Blast Database
Create Rings
Create Rings Index
Rename Rings
Auto Profile
Calculate Ring Reserves
Display Rings
Remove Rings
Navigate Rings
Display Current Ring Name and Dump Angle
Change Ring Dump Angle
Display Characteristics
Create Hole
Create/Edit Five-Spot Hole
Move Hole
Copy Hole
Delete Hole
Edit Hole Diameter
Shuffle Holes
Adjust Hole Length
Comment Hole
Layout Hole Pattern
Fill Hole Pattern
Change Hole Sequence
Explosives Loading
Explosives Loading menu contents
Load Hole
Load Ring
Edit Hole Loading
Edit Hole Capping
Explosives Timing
Edit Ring Report Format
Edit Ring Report Format
Layout
Drilling
Explosives
Sorting Columns
Report on Rings
Plot Rings
Export to IREDES
Ventilation
Contents
Create / Open Network
Save Network
Close Network
Defaults
Open Fan File
Add Fan
Edit Fan
Delete Fan
Save Fan File
Display Attributes
Create Branch
Edit Branch
Edit All Branches
Reverse Branch
Delete Branch
Insert Node
Move Node
Execute Simulation
Report
Panel Caving Designer
Dragline
Contents
Overview
Files
Contents
Open
Save
Save As
Close
Delete
Dragline Equipment
Ancillary Equipment
Block Report
Operation Report
Volume Report
Sections
Contents
Working
Define
Create
Delete
Set Current
Advance Current
View Current Section
Define Origin
Edit Label
Attributes
Change Section Line RLs
Horizons
Contents
Create/Edit Horizons
Create/Delete Surfaces
Strips
Contents
Create
Delete
Edit Extents
Translate All
Highwall Profile
Edit Labels
Label Attributes
Create Max Spoil Profile
Create Spoil Fit Report
Generate Toes and Crests
Points
Contents
Create Points
Delete Points
Edit Point Names
Line Intersection
Blocks
Contents
Create
Delete
ID Block
Set Swell Table
Edit Repose
Edit Swell
Edit Rehandle
Reset Log File
Reset Undo Stack
Reset Section
Edit Label
Drag Label
Rotate Label
Recentre Labels
Unrotate Labels
Label Attributes
Move Blocks
Contents
Overview
Start/End Sequence
Begin/End Macro
Dragline - Right Toe
Dragline - Centre
Dragline - Left Toe
Bulldoze - Left
Bulldoze - Right
Bulldoze - Uphill
Bulldoze to Bench
Area Balance
Area Reshape
Area Cut & Fill
Split Block
Merge Blocks
Create Block
Remove Block
Export Block
Nullify Block
Select Dragline
Set Position
Unset Position
Undo
Redo
Animate
Templates
Contents
Overview
Create
Create From Surface
Create Dragline Bench Template
Delete Template
Convert Profile
Import
Lines
Contents
Create
Delete
Edit Label
Attributes
View
Contents
Setup
View Current Section
Change View
Reverse View
Coordinate
Distance
Link Strings
Horizon Legend
Dragline Legend
Reset Visibility
Toggle Sections
Toggle Surfaces
Toggle Strips
Toggle Block Labels
Toggle Templates
Toggle Lines
Toggle Points
Toggle Other
Dragnav
Contents
New
Preview
Save
Plan Surfaces
Plan Data
Interactive Sections
Multiple Sections
Drill and Blast
Contents
Files
Drill Rig Library
Explosives Library
Specifications
Specifications
Explosive Loading Styles
Pattern Specifications
Reporting Specifications
Posting Specifications
Display Characteristics Settings
Load
Remove
Create
Create
Create Holes At Points
Create Holes Along Line
Create Holes Along Collar and Toe
Create Holes To Free Face
Create Registered Outline
Create Blast Solid
Explosives Tie-ins
Create Timing Model
Create Timing Animation
Edit
Rename Blast
Edit Visibility
Edit Display Attributes
Apply Display Characteristics
Split Blast By Polygons
Merge Blasts
Edit Holes
Rename Holes
Rename All Holes By Object
Modify Hole Name
Reverse Row Direction
Recalculate
Move Holes
Translate Holes
Rotate Holes
Minimum Burden Adjustment
Delete Holes
Delete Holes by Polygon
Insert Hole
Double Stitching
Design Charge Depths
Analysis and Reporting
Constrained Hole Selection
Compare Holes
Offset to Face
Export Intercepts
Sample Interval Specifications
Export to Database
Hole Clearance Check
Hole Separation Report
Reporting
Tritronics Export
Posting
Export to IREDES
Gantt
Overview
Vulcan
Open
Activity
Create
Delete
Update From Design
Precedences
Vulcan Manual Precedences
Display
Hide
Display Settings
Colour by Periods
Colour by Attributes
Mining Direction
Generate Directions
Flip Directions
Select and Reverse
Display Directions
Hide Directions
Transfer from STP module
Check VGSKEY
Vulcan Gantt Scheduler
About the Interface
Keyboard Shortcuts
Quick Access Toolbar
Gantt Chart Window
Summary Report Window
Notification Center Window
VGS Home
Home Tab
New
Delete Activity
Properties
Update Activities
Update Reserves
Percent Complete Update
Split
Remove Split
Join All Bars
VGS Setup
Setup Tab
Project Options
Reserve Attributes
Attributes
Activity Types
Lookup Tables
Calendars
Plan Start Date
Periods
Current Period
VGS Layout
Layout Tab
Groups
Current Group
Sorting
Column Format
Column Order Manager
Current Column Order
Update Column Order Definition
Save/Load/Reset
To Move/Move Here
VGS View
View Tab
Vulcan Selection
Vulcan Zoom
Vulcan Hide
Vulcan Shadow
Select in Vulcan
Zoom in Vulcan
Colour by Periods
Colour by Attributes
Animation
Current Colour
Caption Manager
Filters
Current Filter
Select Multiple Filters
Display Resource Calendar
VGS Precedences
Precedence Tab
Group Manager
Current Precedence Group
New Group
Spatial Precedences
Create
Remove
Properties
Precedence Arrow Visibility
VGS Report
Report Tab
Report Setup
Sync Report
Pivot Table Report Manager
Create New Pivot Table Report
Activity Grid
Current Report
Export Activity Grid To Excel
Activity By Period
Critical Path
VGS Resources
Resources Tab
Settings
Allocate Resources
Open Resource Chart
Export Resource Chart To Excel
VGS Levelling
Levelling Tab
Resource Levelling Setup
Levelling by Capacity
Activity Leveling Setup
Current Levelling
Labs
Face Mapper
Setup
Create Resources
Create Feature Files
Configuration
Create Plot Resources
Tools
Key Toolbar
Import GSI Station
Freeze Grids Back Walls
Load Drillholes
Remove Drillholes
Display Comment Labels
Remove Comment Labels
Display Structures
Section View
Grid On
Grid Off
Mapping
Load Drive Layer
Add Station
Rename User Station
Station Section
Walls Mapping
Backs Mapping
Lines To Samples
Feature Lines
Lines To Polygons
Feature Replace
Feature Structures
Face Reserve Grades
Face Grades
Wall Grades
Back Grades
Digitise Grades
Calculate Rock Mass Classification
Add Comment
Pictures
Picture Display
Picture Crop
Picture Scale
Picture Translate
Picture Rotate
Post Processing
Register Face
Fold Profile
Unfold Profile
Design To Actual
Flag Contact Points
Extract Contact Points
Plot Face
Export Face Comments
Export Face Summary
Picture Copy
Pre-Setup Process
Intended Workflow – Backs/Walls Mapping
Intended Workflow – Face Mapping
FAQ/Troubleshooting
Appendices
Workbench
Workbench Menu Contents
Load Layout
Save Layout
Initial Layout
Customise
Localisation
Context Menus
Hotswap
Isis Database
Introduction
Introduction to Isis
Database Designs
Database Elements
Databases
Common ODBC Problems
Database Recovery
File
New Database
Open Database
New Design
Open Design
Examples for download
Close
AcQuire
Vega ODBC
Save
Save As
Save Design As
Delete Database
Delete Design
Quit Isis
Exit Workbench
Edit
Cut
Copy
Paste
Select All
Delete
Find
Find Next
Preferences
View
Data View
Design View
Object
Insert
Delete
Table
Insert
Append
Delete
Insert Records
Sort Ascending/Descending
Utilities
Import
Database
Tables
Export
Database
Tables
Convert ODBC dsf to Headered
Convert Headered ODBC to dsf
Convert Back to Shorter Names
Field Calculation
Script
Edit
Run
Validate
Specifications
Select Database
Collar Checks
Unique Collar Location
Collar on Surface
Downhole Checks
Empty Table
Total Depth
Overlapping Intervals
Increasing and Decreasing
Maximum variation
Unique Values
Sequence
Derived Value
Along Recod Checks
Field Sum
Individual Field Checks
Minimum and Maximum Values
Translations
Case Of
Mandatory
Expression
Report
Save and Run
Database Generation
Script Structure
Script Directives
Definitions and Generators
Conditional Statements
Command Lists
Input and Output
Examples
Query Language
Introduction
Running Inquisitor
Language Syntax
Using the Language
Record Statement
Record Variable
Data Statement/Variable
Expressions
Exec Statements
Control Statements
Reference
Example Script
Commandline Programs
Overview
Analysis
ASCIIT2TRI
APD
BADD
BASSIGN
BBENCH
BCALC
BCHOP
BCHNAME
BCONVERT
BCSVTO
BDECOMPRESS
BDELETE
BEDTAB
BEDVAR
BEFSUMREP
BEXPORT
BEXPR
BEXTENT
BEXTRACT
BFILL
BHEAD
BHISTORY
BIMPORT
BINDEX
BINSERT
BLOCK_TO_PEXEL
BM_DOUBLE_TEST
BMARCH
BMARCHV2
BMASK
BMERGE
BMINE
BMODEL
BOPTIMISE
BORIGIN
BPITVIEW
BREBLOCK
BRESERVE_V2
BRESET
BREVERSE
BRIMPORT
BSTRAT
BSTRAT2
BTOCSV
BTRANSFORM
BTRIANGLE
BTRIBLOCK
BTRIFLAG
BUNCHOP
BUPGRADE
CompareBlockmodels
CompareDGDs
CompareGrids
CompareTris
Compliance
COMPRESS_DGD
CopyDGDLayerTo
DATUPD
DBCMPT
DBLIST
DBLOAD
DBMERG
DBSCRIPT
DBTABL
DECLUSTER
DGD2DGN
DGD2DWG
DGDDUMP
DGN2DGD
DJBMEST
DJBMESTMULTI
DSF_A2B
DSF_B2A
DWG2DGD
EXEBMNSCORE
EXEBMSCTRAN
EXEDJSISIMMR
EXENSBACK
EXENSCORE
EXEPOSTSIM
EXESCBACK
EXESCTRAN
EXESGSIM
FIXDHD
FLAGDRILLDB
FLAGSAMPDB
GCOPT
GEOTECH_CONVERT
GIF_TO_PEXEL
ImportCSV
level_layout
MERGE_DGDS
MVTRANSFORM
RGB_TO_PEXEL
RGB_TO_PS
RGB2RTL
SPEC_MERGE
TIF2IREG
TRI2IV
TRIADJPOINTSDGEN
TRIAPPEND
TRIBENCH
TRIBOOL2
TRIBOOLEAN
TRICLEAN
TRICLOSE
TRICUTFILL
TRICVOLUME
TRIDISPLAY
TRIDM
TRIDUMP
TRIFAULT
TRIFILTER
TRIGEMCOM
TRIGRID
TRILOAD
TRIMAKE
TRIMINESIGHT
TRIPRODUCE
TRIREGISTER
TRIRELIMIT
TRISHELL
TRISIMPLIFY
TRISNAP
TRISPLIT
TRISUBTRACT
TRITEST
TRITRANS
TRITVOLUME
TRIVOLUME
TRIVOXELATE
UNCOMP
VDA
VULC_STOPEOPT
Block Model Utility
Overview
Starting the Block Model Utility
File
New
Close
Open
Save
Save As
Quit Block Model Utility
Exit Workbench
Model
Create Model
Estimation
New Estimation Run File
Open Estimation Run File
Execute Estimation Run File
Run Estimation
Rapid Pit Design
Contents
Introduction
Properties Window
File
File menu contents
Load Specification
Edit Specification
Components
Benches
Pit Design
Reserving
Preferences
Quit Rapid Pit Design
Exit Workbench
Utilities
Utilities menu contents
New Component
Projection Method
Create Polygon
Insert Ramp
Insert Switchback
Flag Ramp
Project
Polygon Offset
Replace String
Move Point
Delete Point
Delete Polygon
Delete Multiple Polygons
Join Components
Intersect Components
Clip Phases
Clip Components
Generate Reserves
Next Bench
Previous Bench
Measure Distance
Measure Angle
Reacquire Attributes
Plotting Utility
File
Open
Close
Close All
Save As Image
Page Setup
Print
Print All
Batch Print
Quit Plot Utility
Exit Workbench
Troubleshooting Guide
Tutorials
Tutorials
Vulcan Data Analyser
Creating a Variogram
Creating a Fan Variogram
Filtering Data
Transforming Data
Chart Viewing and Exporting
Block Menu
Opening a Block Model
Building a Block Model
Load_Dynamic_Model
Polygon Flag
Support Analysis
Ellipsoid Method
Pit Optimiser Charting and Reporting
Pit Optimiser Visualisation of Pit and Period
Design Menu
Getting Started
Templated Attributes
Applying Conditional Attributes
Applying Datatips
Applying User-Defined Vulcan Attribute Datatips
Using the Find Functionality
Creating Moving Objects
Initiating a Vulcan Command
Initiating a Lava Script
Polygon Morph
Intelligent Objects Tutorials
File Menu
Import CSV
Create 3D PDF
Gantt Scheduler
Gantt Scheduler Creating Activities
Gantt Scheduler Creating Precedences
Gant Scheduler Resource Allocation and Leveling
Gant Scheduler Animation
Gantt Scheduler Summary Report
Gantt Scheduler Viewing and Interacting with Activities
Geology Menu
Downhole Geophysics
Principle Component Analysis
Isis Database
Creating a Samples Database
Open Pit Menu
Highwall Roads
Multiple Roads
Haulage Profile Route Cycle Estimation
Rapid Pit Designer
Rapid Pit Design
Underground Menu
AutomaticRamp
InteractiveEditRamp
CentreLine
UndergroundRingDesign
View Menu
AutoView
Preferences
Overview
Vulcan
Vulcan Explorer
File Types
Triangulations
Grids
Dialogs and Popups
Graphics
Input
Colours
Effects
Video Capture
Defaults
2D Text
3D Text
Arrows
Dimension
Draw by Hand
Triangulation Attributes
Load Dynamic Model
Miscellaneous
Paths/Directories
Plot All
Dragline
Drill and Blast
Plot Utility
System
Appendices
File Information
Archived Layers
Colour Scheme
DXF Conversion Table
Features Specifications
Vulcan Defaults
Primitives Specifications
Start Up Parameters
Statistics Definition File
Tiled Texture Resource Specifications
Transformation Matrices File
Vulcan Design Database Listing
Window Parameters
ASCII Map
Batch Plotting Specifications
Batch Plotting Report
Standard Patterns
Standard Peripheral Devices
Pitboss Transfer File
Menu Appendices
File
Class Libraries for maptek.vulcan
maptek.vulcan.attributes
maptek.vulcan.block_model
maptek.vulcan.callback
maptek.vulcan.dgd
maptek.drillhole_database
maptek.vulcan.grid
maptek.vulcan.isisdb
maptek.vulcan.layer
maptek.vulcan.mapio
maptek.vulcan.metadata
maptek.vulcan.arrow
maptek.vulcan.polyline
maptek.vulcan.dimension
maptek.vulcan.text
maptek.vulcan.text3d
maptek.vulcan.point
maptek.vulcan.section_widths
maptek.vulcan.tri_attributes
maptek.vulcan.triangulation
maptek.vulcan.variant
Class Libraries for maptek.vulcan_gui
maptek.vulcan_gui
maptek.vulcan_gui_options
maptek.vulcan_gui.gpan
maptek.vulcan_gui.panel
maptek.vulcan_gui.pick_point
maptek.vulcan_gui.selection
maptek.vulcan_gui.temp_object
Model
Model Appendix A
Stratigraphic Horizons
Modflow Control
Model Appendix B
Boundary Conditions (Aquifem-n)
Grid Calc
Grid Calc_Appendix A
GridCalc Appendix A: File Information
Fixmap Split Definitions File
Fixmap Specification File
Database Conditions
Macro Commands
Grid Calc Global Specifications
Addtdlitho.dbg
Stratigraphic Horizons
Grid Calc Appendix B
Grid Model Scripts
Grid Calc Appendix C
Overview
Running Fixmap from the command line
Common Problems
Creating a Fixmap Database
Hand Editing Mapfiles
Rsvute
Rsvute Appendix A
File Information
Reserves Specifications
Table
Polygon Reserves Sequences
Reserve Macros
Grid Calc Global Specifications
Grid Calc Macros
Rsvute Appendix B
Using Benching and Batters
Using Benching and Batters
Using Benching and Batters
Bench Grid Creation
Limit Polygon Creation
Wall Projection
Specifications
Using Limit Polygons
Using Grid Masks
Block
Block Appendix A
File List
ASCII Block Model Regular
ASCII Block Model Sub Blocked
ASCII Map
Block Model Definition File (Block Construction)
Block Definition (Block Transfer)
Advanced Reserves Calculation Results
Advanced Reserves Calculation Parameters
Advanced Reserves Report Parameters
Advanced Reserves Report
Block Manipulation Script - 1
Block Manipulation Script - 2
Block Manipulation Script - 3
Block Manipulation Script - 4
Stratigraphic Horizons
Variogram Experimental Model
Variogram Parameters
Variogram Results
Variogram Fitting/Editing/Conversion
Variogram Display Parameters
Variogram Block Definition
Block Variables Assignment File
Block Identifier File
Tri-Blocking Parameters File
Block_Appendix_B
B - Whittle 4D Errors
Block_Appendix_C
Overview
Whittle 4D Interface
Exporting to
Importing from
Terminology
Block_Appendix_D
Geostatistical Modelling
Introduction
Regionalised Variables
Structural Analysis - Variography
Semi-Variogram Properties
Continuity
Zone of Influence
Anisotropies 1
Model Variograms
Variogram Modelling
Nested Structures
Anisotropies 2
Proportional Effect and Relative Variograms
Origin of Nugget Effect
Regularisation
Auxiliary Functions
Extension and Estimation Variance
Grade Interpolation - Kriging
Geological Modelling Consideration
Iroad
Notes on Slopes and Grades
File Information
Default Design Parameters
Slopes and Grades Specification
Survey
Appendices
Survey Appendix A
File Information
Least Squares Adjustment Report
Bowditch Adjustment Report
Coordinates Report
Input Observations File
Radiation Report
Reduction Report - SDR22
Reduction Report - TOPCON
Offsets Report
Stations Library File
Survey Codes Files
Upload File - Geodat
Volumes Report
Volumes (Vulcan) Report - Normal style
Volumes (Vulcan) Report - Mine style
Reduction Report - GEODAT
Traverse Reduction Adjustment Report - Unadjusted
Traverse Reduction Adjustment Report - Adjusted
Traverse Calculations Report
Vulcan Field Survey File
Survey Appendix B
Overview
Input Observations File
Horizontal Adjustment
Vertical Adjustment
Survey Appendix C
CRITERION 400
GEODAT
Overview
SOKKIA
TOPCON GTS-7
TRIMBLE GPS
WILD/LEICA
Geology
Contents
Geology Appendix A
File Information
ASCII Map
Section Resources Parameters
Multiple Label Specifications
Sampling Parameters
Scheme File (Grid Reserves)
Translation Table
Composite Specifications
Geology Appendix B
Sampling Parameters
Format of the SMP File
Common SMP Sections
Client Specific SMP Sections
Geology Appendix C
File Information
Inquisitor Template and Metafile Production
Washability Mapfile Structure
Washability
Washability Appendix A
Description of Records and Tokens
Metafile Record Hierarchy
Specimen
Geotech
Geotech Appendix A
Geotechnical Specification
Galena Parameters
Stratigraphic Horizons
Geotech Appendix B
Geotech Display Layers
Open Pit
Open Pit Appendix A
Blast Design Specifications
Blast Reserve Report
Dragline Parameters
Sampling Parameters
Export File (Network Design)
Haul Report
Hole Report (Summary)
Units of Measurement
Hole Report (Full)
Network Defaults
Macros (Benching & Batters)
Multi Stripping Parameters
Operations Parameters
Outline Report
Report Specifications
Reserves Report (Benching & Batters)
Reserves Report (Terrace Mining)
Reserves Report
Reserves Specifications (Benching & Batters)
Reserves Specifications (Terrace Mining)
Stratigraphic Horizons
Terrace Mining Log
Stripping Report (Long Term)
Stripping Report (Short Term)
Stripping Report (Rehandles)
Survey Report
Volume Report
XPAC Export File
XPAC Export File
Monitoring Specifications
RIN Database dump file
Open Pit Appendix B
Format of the SMP File
Common SMP Sections
Angled Benches
Open Pit Appendix C
Macro File Commands
Open Pit Appendix D
Grade Control Design
Date Stamping
Grade Control
Appendix D - Grade Control
Appendix D - Grade Control Design
Appendix D - Date Stamping
Underground
Underground Appendix A
Graphical Attributes File
Underground Blast Display Preferences File
Blast Design Specifications File
Geology Setup Parameter File
Ring Report Style File
Explosives Report Style File
Expression Handling
Panel Structure Template File
Reserve Parameters File
Underground Development Preferences File
Reserve Calculations File
Dragline
Contents
Module Conventions
Dragline Database
Ancillary Database
Example Macro Scripts
Macro Functions
Block History
Named Positions
Specifications File
Over/Under Break
Isis Appendices
Name Conventions
Database Listing File
Field Calculation Scripting
Database Validation
Database Validation (dbdchk program)
Core Appendices
Core Appendices
File Information
Fortran Format Statements
Operators and Functions
Operators/Functions (old Statistics)
Script File Format
RGB Values
Macro File
GEOSTAT
Contents
Basic Concepts
Data Input Processes
Organisation of Databases
Borehole Compositing
Statistical Analysis
Geostatistical Analysis
Economic Evaluation
Reserve Calculations
Other Comments
AMS Stope Shape Optimiser Manual
Contents
Purpose
1 Stope Shape Optimiser
2 Slice Method
3 Prism Method
4 Optimisation Options (Slice & Prism)
5 Geological Risk (Slice & Prism)
6 Running Stope Shape Optimiser External to Vendor Interfaces
Appendix A Common Terms Used
Glossary
Terms
References
Vulcan
You are here:
Current Report
Export the current report in CSV format.
Was this page helpful?
Leave a comment (optional)
Submit
Vulcan Index
Home
Vulcan Quick Start Guide
Installation
Vulcan Installation and Configuration
Installing a Network Licence
FlexNet Licence Administrator
Borrowing a Licence from the FlexNet Server
Maptek Floating License Server (FLS)
Product Support
Technical Support
Office Locations
Copyright Notice
Troubleshooting
Getting Started
Introduction to Vulcan
Overview
Starting Vulcan
Accessing Help Topics
Different Methods for Starting Vulcan
Vulcan Menus
Setting Up Vulcan
Creating a Project File (dg1)
Primary Window
Colours
Patterns
Line types
Design Defaults
Desktop Icons
Viewing Design Work
Opening a Design Database
Selecting Layers
Using the Mouse
Keyboard Controls
Selecting Design Data
Viewing Data
Rotating the View
Saving Views
Full Screen Mode
Load View Toolbar
Looking From Different Points
Overview Window
Perspective Mode
Editing Design Data
Entering Design Data
Digitising
Indicate Mode
Snap to Objects
Smart Snap
Snap to Grid
Snap to Points
Property Editor
Fonts
Saving Your Work
Exiting Vulcan
Data Structures
Data Hierarchy
Design Files
Layers
Objects
Additional Data Organisation
Coordinate Points
Structuring Your Data
System Files Listed by Module
System Files Listed by Extension
Specification and Parameter Files
Database Management
Contents
ODBC Interface
Recovering a Database
Compressing a Database
Unlocking a Database
Scanning a Database
Repairing a Database
Restoring a Backup
Crash Reports
Toolbars
Overview
Advanced Object Label
Analyse
Angle Input
Animation
Bearing Input
Custom Cursor
Delete
Design
Digitise
Dragline
Dragline - Move Blocks
Draw by Hand
Drill and Blast - Create
Drill and Blast - Edit
Drill and Blast - Files
Drill and Blast - Report
Dump
Dynamic Volume
Effects
Expand
FixDHD (Fix strat from DB)
Gaussian Transformations
Geology Drilling
Geology Section
Grade Control - Display
Grade Control
Graphics
Grid
Grid Calc - Advanced
Grid Calc
Haulage
History
Insert
Keyboard Input
Load View
Look At (Look From Point)
Macro Control
Merge
Modify
Move
Open
Open Cut Design
Phase Design
Point Clouds
Predefined Solids
Primitives
Ramps
Relimit
RotateMode
Rsvute
Sequence
Slice
Standard
Status
Texture
Translucent Factor
UG Explosives
UG Ring Design
Visibility
ZoomTo
Menu Topics
File
Contents
New
Open
Design Files
Contents
Directory
List Files
Open
Convert
Layers
Contents
List
Load
Load All
Load By Polygon
Reload
Remove
Underlays
Contents
Overview
Load Layer
Remove Layer
Convert/Display Coloured Points
Convert To Object
Remove
Remove All
Symbols
Contents
Overview
New
Load
Save
Save As
Delete
Inherit Colour
Line Styles
Contents
Overview
New
Load
Save
Save As
Delete
Repeat Distance
Set Invariance
Remove Invariance
Sine/Cosine Wave
Convert
Contents
Overview
Block To Pexel
Image To PostScript
Save
Save Layer
Save Layer To
Load Screen
Save Screen
Archive
Load Archive
Load Recovered Layers
Plot
Plot Builder
Plot All
Batch Plotting
Plot File
Page Setup
Data Extent
Multiple Page Setup
Cutting Planes
Drawing Order
Display Scheme
Plot Elements
Plot Elements
Borders
Views
Gridlines
Gridlines
Absolute
Relative
Centreline
Plan/Section/Width
Title Block
Legends
User Notes
Scale Bars
North Points
Data Elements
Data Elements
Database Fields
Digitised Drafting
Grid Models
Triangulation Models
Surface Model Clipping
Block Model
Block Annotation
Block Selection
Examples
Plan with DGD Data
Plan with Border Style and DGD Data
Section with Border Style and Block Model
Rotated Plan with DGD Data
Section with Drilling and Triangulations
Section with Drilling and Assay Colour Bars
Section with Drilling and Paired Grid Surfaces
Flexed Section with Drilling and Paired Grid Surfaces
Plot Existing Files
Plot Edit
Contents
Overview
Load
Open Plot-Edit Window
Create
Sheet Template
Clip
Drafting Sheets
Contents
Overview
Drafting Sheet Builder
Load Drafting Sheet
View
Scale Bar
North Arrow
Title Block
Design Line
Permanent Text
Text Field
Plot Elements
Legend
Images
Drafting Page Size
New
Load
Save
Save As
Delete
Import
Contents
3d Dig
ASCII
Design Strings
Grids
Triangulations
AutoCAD (dwg, dxf, dxb)
Design Strings/Grids/Triangulations (dwg, dxf, dxb)
ICF Tables Setup
CSV (Databases)
Databases
Databases Update CSV
Synonym Assignment
Datamine
Block Models
Block Models (Reblocked)
Databases
Design Strings
Triangulations
DTED Elevation Data
Design Strings
Easimine
Block Models/Design Strings/Triangulations
Esri (shape, grid, tin)
Design Strings
Grids
Triangulations
Gemcom
Triangulations (ASCII)
Geocomp
Design Strings
Geosoft
Grids
Voxel
KML
Import KML Design Strings
LIDAR
LIDAR Data
Load ArcInfo ASCII Grid Using Reduce Method
Load ArcInfo ASCII Grid Using Decimate Method
Load Point Data Using Sampling Method
Load Point Data Into Layer
Micromine
Databases
Design Strings
MicroStation
Design Strings
MineSight
Block Models
Design Strings
Triangulations
Triangulations (ASCII)
Minex
Grids ASCII
Triangulations
Optech
Triangulations
Phodat
Design Strings
STL
Triangulations
Surpac
Design Strings (v1)
Design Strings (v2)
Triangulations
Whittle 4X
Block Models
Export
Contents
3d Dig
ASCII
Design Strings
Grids
Minex
AutoCAD (dwg, dxf, dxb)
Design Strings/Grids/Triangulations (dwg, dxf, dxb)
ICF Tables Setup
Triangulations
CSV (Databases)
Databases
Datamine
Design Strings
Triangulations
Easimine
Triangulations
Esri (shape, grid, tin)
Design Strings
Grids
Triangulations
Inventor
Triangulations
KML
Export KML Design Strings
Micromine
Design Strings
MicroStation
Design Strings (dgn v8)
NGRAIN
Block Model
Design Data
Grids
Triangulations
PDF
Block Model
Design Data
Triangulations
Pitboss
Design Strings (blast)
Design Strings (strat)
STL
Triangulations
Topcon
Trimble
Triangulations
Ventsim
Ventsim Design Strings
VRML
Block Models
Design Strings
Grids
Triangulations
Whittle 4X
Model
Opti Cut
Pit List
Colour Table
Contents
Colours
Save
Rename
Delete
Upgrade
Macro Create
Lava
Contents
Introduction
Running a Lava Script
Functions
Classes
Lava Scripting Support for VGS
Gantt Lava Scripting Functions
Lava Scripts for VGS Testing
GPAN
Example
Python
Python Script
Writing Python Scripts
Index of Python Class Libraries
Run Stored Procedure
Run Command
Quit Vulcan
Design
Overview
Contents
WinTab Digitiser
Contents
Overview
Attach Viewport
Detach Viewport
Set Up Transformation
Configure WinTab Context
Create
Contents
Layer
Point
Line
In Plane
Polygon
Paste Object
Polygon Textured
Rectangle
Grid
Arc
Ellipse
Arrow 2D
Arrow 3D
Spline
Symbol
Line draw by hand
Polygon draw by hand
Configure draw by hand
Create Text
Import Text
Create 3D Text
Import 3D Text
Features
Dimension
Contents
Line
Line Components
Radius
Angle
Arc
Attributes
Move
Swap Points
Mirror Horizontal
Mirror Vertical
Mirror Both
Colour
Reposition
Construction Points
Contents
Overview
Distance
Equal Parts
Intersect
Digitise
Z Cut
Compass
Ruler
Insert By Distance
Insert By Point
Insert By Line
Delete
Delete All
Selection Criteria
Contents
Select By Polygon
Create Boundary
Enable Boundary
Disable Boundary
Group
Ungroup
Enable
Disable
Metadata
Contents
Overview
Create/Edit Specification
Assign Metadata
Delete Metadata
Get Object Metadata
Setup Display Attributes
Apply Display Attributes
Reporting
Templated Attributes
Contents
Edit DGD Templates
Assign Data
Get Object Data
Colour By
Visible By
Contents
Delete Attributes
Edit Resource Templates
DGD Template to Resources
Resource Template to DGD
Templated Attributes Expressions
Layer Edit
Contents
Identify
Name
Copy
Delete
Transfer
Unify
Make Current
Multiple Object Filter
Object Edit
Contents
Identify
Delete
Delete by Poly
Clip by Multi- Poly
Clip by Solid
Clip by Triangulation
Trim
Drag
Offset
Split
Intersection Split
Paste
Join Point
Join Lines
Coalesce
Reverse
Reverse Advanced
Sort
Consistent
Point Name
Connection
Cross Check
Grid Snap
Filter
Register
Z Value
Register by Plane
W Tag
Grade
Delete End Point
Explode
Transform
Colour by Gradient
Polygon Edit
Contents
Area
Expand
Boolean
Boolean by Plane
Build
Morph
Partition
Impose
Pairs
Radii
Boundaries
Tessellate
Skeleton
Network
Remove Crossovers
Delete Bridges
Point Edit
Contents
Resequence
Move
Move To Intersection
Multi-Move Points
Grid Snap
Name
Z Edit
W Tag
Weight Point Values
Symbol
Colour By Attribute
Remove Attribute Colouring
Delete
Delete Duplicate
Disconnect
Connect
Cut
Append
Best Fit
Move By Distance
Move By Point
Move By Line
Point Insert
Contents
Insert
Replace String
Dynamic Replace String
Multi-Replace String
Plane Insert
Insert At Intersection
Multi-Insert at Intersection
Insert At Distance
Interpolate
Measure
Apply Curve
Intersection At Elevation
Intersection With Triangulation
Attribute Edit
Contents
Name
Description
Group
Ungroup
Group By Attribute
Value
Close Polygon
Open Polygon
Feature
Graphics
Segment Colour
Attribute to Value
Attribute Editor
Along Line
Assign W Tag
Edit W Tag
Clear W Tag
Label W Tag
Interpolate W Tag
Create/Edit Primitives
Primitive Visibility
Remove Primitive
Polygon Texture Primitive
Apply Spline
Remove Spline
Insert Points on Spline
Relimit
Contents
By Distance
To a Point
To a Line
Multi-Line Relimit
To a Plane
To Surface
Transformation
Contents
Translate
Rotate 2D
Rotate 3D
Rotate Arbitrary
Scale
Calculate
Matrix
Mirror
Geographic
GDA Conversion
Text Edit
Contents
Edit
Move
Drag
Substitute
Delete
Text To Point
Attributes
Font
Font Size
Angle
Text Rotate
Colour
Convert to 3D Text
Text 3D Edit
Contents
Edit
Attributes
Colour
Convert to 2D Text
Arrow Edit
Contents
End Points
Attributes
Colour
Line Type
Line Style
Contents
Apply Style
Remove Style
Symbolise Line
Symbol At A Point
Symbolise Points
Unsymbolise Points
Feature Edit
Contents
Default
Feature Editor - Layer Object Name
Feature Editor - Object Attributes
Feature Editor - Point Attributes
Feature Editor - Digitising Attributes
Intelligent Objects
Intelligent Objects Editor
Open Specification
Database
Labelling
Types
Save Specification
Control Points
Map Section To Plan
Data Posting
Undo
Redo
View
Contents
Overview
Visibility
Contents
Visible
All Visible
Shadow
All Shadow
Invisible
All Invisible
Freeze
Freeze All
Design Visibility
Triangulation Visibility
Grid Visibility
Visible By Feature
Shadow By Feature
Invisible By Feature
Section Shadow Visible
Section Shadow Invisible
Change View
Contents
Set View
By Object
Section
Section Strat
Vertical Exaggeration
Walk
View Point Walk
Look From
Look
Flyby
Windows
Contents
Open
Create
Delete
Edit
Select
Fit Layer
Shaft View
Contents
Overview
Create
To Shaft View
From Shaft View
Animation
Contents
Overview
Create
Frames
Load
Run
Path
Create Section
Section Definition
Primary Section Shadows
Delete Section
Move Sections
Save View Settings
Switch To East Section
Switch To North Section
Switch To Plan Section
Sections Panel
Analyse
Contents
Overview
Details
Contents
Coordinate
Distance
Perpendicular/Shortest Distance
Along String
Total Length
Area
Centroid
Polygon Area
Full
Curvature
Strike/Dip
List
List Objects
Find Objects
Layer Range
Angle Distance
Grid
Contents
Apply
Properties
Geographic
UTM Grid
Remove
Label
Contents
Point Label
Point Label to Text
Object Label
Advanced Object Label
Annotate String Z Value
Underlay Label Colour
Remove
Attribute Data
Contents
Inquire
Create
Modify
Delete
External Data
Contents
Set Up
Inquire
Set Up Export
Export from Selection
Export from Point
Data Analyser
Overview
Preferences
File
File Menu
Creating Project Templates
Data
Replacing a Data Source
EDA Panels Selection
EDA Panels Transformation
EDA_Panels_Weight
Domain Manager
Downhole Prompt
The Database
Data Explorer
Explorer Visibility Pane
Chart Explorer
Custom Domains
Specify Direction Grid
Apply Filter to Data
Applying a Weighting Scheme
Log or Gaussian Transformations
Viewing in Vulcan
Stats
General Statistics
Histogram
Define Bins for Histogram
Boxplot
Cumulative Frequency
Scatter / Line Plot
QQ [Quantile - Quantile Plot]
PP [Probability - Probability Plot]
Correlation Matrix
Pie Chart
Swath Plot
Contact Profile
Data Spacing
Analysis
Grade Capping
Variography
Creating a New Variogram
Creating a New Fan Variogram
Creating a New Ortho Variogram
Creating a New Cross Variogram
Creating a Cross Orthogonal Variogram
Creating a New Blockmodel Variogram
Editing and Modelling a Semivariogram
Editing and Modelling a Fan Variogram
Editing and Modelling an Orthogonal Variogram
Editing and Modelling a Cross Variogram
Creating a Cross Orthogonal Variogram
Editing an Existing Blockmodel Variogram
Specify Single Direction for Block Model Variogram
Specify Multiple Directions for Block Model Variogram
Save and Load Variogram Properties
Downhole Variography
Autofit
Export
Chart Grid
Tab View
Analyse EDA Panels Export
Connectivity
EDA_Ribbon_Connectivity
Visualization
Visualization
Charts
Tab View
Grid View
Multiple Charts of Mixed Types
Exporting Charts
Statistics
Contents
Overview
Advanced Statistics
Open Specification
General Setup
Data Elements
Global Conditions
Graph Type
Output Display
Display
Output
Terminology
Legend Editor
Draw Legend
Display Legend
Model
Contents
Overview
Grid Mesh Surfaces
Contents
List
Load
Remove By Name
Create Simple
Mask
Invert Mask
Unmask
Contour
Drape
Min/Max
Patch
Set Value
Node Edit
Triangulate
To Object
Create Mapfile
Remove
Triangle Files
Contents
List
Rename
Load
Load by Location
Display by Colour
Properties
Remove by Name
Remove by Location
Remove
Triangle Utility
Contents
Relimit
Intersect
Cut
Cut By Lines
Merge
Poly Boolean
Boolean
Multi-Boolean
Delete Internal Walls
Fill Holes
Repair
Auto Expand
Expand
Smooth
Display Colour Scheme
Create Selection File
Append
Check
Minimum/Maximum
Register
Fault
Strip
Footprint
Shrink Wrap
Plane
Bench Profile
Section Profile
Section by Line
Find Path
Scale
Translate
Rotate
GDAÂ Conversion
Triangle Surface
Contents
Create
Two Polygons
Grid Mesh
Interactive Creator
Relimit by Polygon
Relimit by Solid
Surface Area
Triangulation Volumes
Add
Subtract
Colour by Orientation
Offset Distance
Extrapolate Points
Extrapolate Triangulation
Extrapolate Two Triangulations
Vertex Z Edit
Move Vertex
Add Vertex
Delete Vertex
Insert Triangle
Delete Triangle
Swap Triangles
Arithmetic
Thickness Between
Triangle Solid
Contents
Create
End Plate
Tri Polygons
Split
Auto Split
Split by Horizons
Close Solid
Delete
Triangle Delete
Repair Solid by Voxelation
Shells (Triangulation Solids)
Surface Levels
Polygons
Contents
Split Underground Drive
Volume
Reserves
Differential Volumes
Create Sphere
Troubleshooting Guide
Triangle Edit
Contents
Overview
Analyse Triangles
Analyse Vertices
Problem Areas
Dump
Filter
Simple Outlier
Small Triangles
Clip By Polygon
Snap Vertices
Connect Vertices
Delete Crossing Triangles
Interpolate
Extrapolate
Line Split
Add Vertex
Delete Vertex
Flip Triangles
To Grid Mesh
From Triangles
Update With Points
Triangle Attributes
Attributes
Colour by Attribute
CSV Import Attributes
Export Attributes
Triangulation Visibility
Remove Attributes
Edit Attributes
Image Registration
Contents
Overview
Create or Open
Close
Add Point
Move Point
Delete Point
Clear All Points
Create Bounding Triangulation
Loading into 3D Window
Remap Loaded Triangulation
Import Georeferenced Image
Primitives
Contents
Create/Edit Primitives
Triangulate Primitive
Contouring
Contents
Contour
Annotate String
Delete Object
Delete Point
Move Point
Connect
Disconnect
Replace
Recondition
Graded Contour
Remove
Modflow Grid
Contents
Overview
Edit Row Height
Edit Column Width
Insert Row
Insert Column
Delete Row
Delete Column
New Entry
Remove
Merge Surface Models
Grid Calc
Contents
Introduction
Overview
Grids
Mapfiles
Naming and Referencing Grids
Naming and Referencing Masks
Modifying Mask Files
Grid Calc Commands
MASK () Function
Mask Modes
Coordinate Window/Range
Starting Grid Calc
Model Validation Techniques
Streamlined Stratigraphy
Integrated Stratigraphic Modelling
Overview
Validate Data
Validate Overview
Validation Specifications
Select Database
Collar Checks
Unique Collar Location
Collar on Surface
Downhole Checks
Empty Table
Total Depth
Overlapping Intervals
Increasing and Decreasing
Maximum Variation
Unique Values
Sequence
Derived Value
Along Record Checks
Field Sum
Individual Field Checks
Minimum and Maximum
Translations
Case Of
Mandatory
Expression
Report
Save and Run
Fault Solid Creator
Overview
Base Solid
Set Up
Fault Design Data
Fault Surfaces
Edit
Preview
Fault Surface Creator
Overview
Database
Triangulations
Extents
Results
Interpolate Drillhole Data (FixDHD)
FixDHD Overview
Drillhole Database
Drillhole Scheme
Drillhole Selection
Horizons
Horizon Control
Lithology
Reliability
Interpolation Control
Partings
Limit Strings
Survey Data
Fault Zones
Output
Preferences
Model Stratigraphy
Model Stratigraphy Overview
Load Specification
Extents
Horizons
Data Source
Database
Drillhole Selection
Additional Design Data
Faulting
Zones
Throw
Crest and Toe
Blocks
Method
Seam Existence
Cropping
Masking
Save
Composite and Model Qualities
Create HARP Model
Create HARP Model Overview
Update HARP Model Qualities
Update HARP Model Overview
Load Specifications
Horizons
Qualities
Save
Quality and Mining Parameters
Quality and Mining Parameters Overview
Load Specification
Quality Parameters
Mining Parameters
Output
Run of Mine Model
Run of Mine Model Overview
Load Specification
Horizons
Options
Output
Strip Ratios
Strip Ratios Overview
Load Specification
Horizons
Options
Output
Export Block Model Surfaces and Solids
Overview
Load Specification
Block Model
Horizons
Average Qualities
Save
Coal Plot Batcher
Coal Plot Batcher Overview
Specification
Template Details
Seams
Qualities
Output
Compare Strat Models
Create Surface
Create Surface
Extents
Data Source(s)
Faulting
Faulting
Zones
Throw
Crest and Toe
Blocks
Method
Masking
Save
Create Multiple Surfaces
Grid Calculator
Mapfile Generation
Mapfile Generation
Drillhole Database
Drillhole Scheme
Drillhole Selection
Horizons
Lithology
Output
Preferences
Edit Modelling Defaults
Contents
Project Defaults
Create Grid Specifications
Access Grid Specifications
Save Grid Specifications
Horizon Table
Splits Definition
Strata File
Define Method
Define Variables
Access Design Database
Close Design Database
Grid Display Defaults
Data Display Defaults
Clear Replay File
Grids
Contents
Load/Calculate Grid
Triangulate Grid
Save Grid
Define Level Grid
Transform Grid
Re-interpolate Grid
Import ASCII Grid
Close All Grids
Data
Contents
Load Design
Pick Design
Load Mapfile
Load DEM
Load Triangulation
Select Triangulation
Transform Data
Filter Data
Trend
Filter Grid
Data Statistics
List
Clear Data
Tri Parameters
Clear Triangles
Dump Triangulation
Faults
Contents
Load Fault Strings
Load Fault Zones
Set Fault Zones
Query Fault Zones
Model
Contents
Grid Model
Triangulate
Save Triangulation
Smooth
LSQ Smooth
Derivatives
Scale
Verify Model
Clip Grids
Grid Fill
Mask
Mask Multiple
Unmask
Contents
Macros
Contents
Overview
Invoke Macro
Create Stacking Macro
Modelling Table
Create Model Table Macro
Edit Macro
Save Macro
Composite Models
Contents
Create Ratio and Burden Grids
Define ROM Quality Parameters
Define ROM Mining Parameters
Create Run Of Mine Model
Grid Query
Contents
Defaults
Header
Statistics
Inquire
Maximum
Minimum
Type
Value
Cell
Grid
Register
Histogram
Area
Contour and Limit Generation
Contents
Contour
Spline Contour
Create Polygon Limits
Display
Contents
Dynamic Display Grid
Static Display Grid
Display Data
Display Triangulation
Display Grid Scale Bar
Remove Underlay
Clear All Grid Calc Underlays
Preferences
Start Console
Rsvute
Contents
Overview
Starting Rsvute
Simple Reserving Procedure
Notes on Ratio and Overburden Calculations
Files
Contents
Select Polygons
Pick Polygons
Highlight Polygons
Deselect Polygons
Deselect All
Save Sequence
Load Sequence
No Table
Table
Save Table
Save Defaults
Load Defaults
Invoke Macro
Save Macro
Edit Macro
Reserves
Contents
Load Derived Variables
Reset Selection
Report Reset
Report Reserves
Project Reserves
Property Reserves
Block Reserves
Period Labels
Define Periods
Target
Deselect Target
Query
Contents
Model
Defaults
Statistics
Tools
Contents
Selection
Reserve
Direction
Selection by Rubberband
Reserve by Rubberband
Direction by Rubberband
Setup Defaults
Load Specification
Horizons and Masking
Variable Parameters
Derived Variables
Report
Units
Reload Model
Display Polygon
Display Quad Tree
Remove Underlay
Clear all Rsvute Underlays
Block
Contents
Overview
Open
Close
Header
History List
Construction
Contents
Overview
New Definition
Open Definition
Display
Create Model
Viewing
Contents
Overview
Inquire
Blocks
Contour
Grade Shells
Pits
Intersect Triangle
Slice
List Slice
Load Slice
Remove Slice
Colour
Image Slice
Load Image
Modify Dynamic Model
Load Dynamic Model
Display Regular Model
Remove
Manipulation
Contents
Overview
Edit Cell
Calculate
Mine
Flag 2D Polygon
Polygon Flag
Triangulation Flag
Edit Script
Edit Script
Maptek Evolution Model
Execute Script
CommandEditor
Add models
Add/remove variable
Add text variable
Advanced Grade/Tonne Report
Assign to model
Check duplicated
Classic to extended convert
Command List
Commands
Convert to pexel image
Create block model
Create regular model from ASCII
Create strat from grids
Create strat from triangulations
Create subblocked model from ASCII
Delete blocks
Edit variable attributes
Estimation ID
Export model to ASCII
Export to CSV
Extract Cells
Flag by Triangulation
Grade Estimation
Grade shells
Grade Simulation
Header to file
Implicit Modelling
Index model
Intersect with triangulation
Mine blocks
Model from CSV
Pit optimiser analysis
Pit Optimiser
Pit Optimiser Viewer Output
Reblock model
Regularise model
Reserve report
Reset to defaults
Run Script
Command Editor
Stope Optimiser
Update from ASCII
User commands
Add Variable
Delete Variable
Edit Variable
Edit Translation Table
Edit Description
Edit Block
Reset to Defaults
Translate
Rotate
Index
Contents
Assign Values
Distance
Extract Definition File
Categorical Smoothing
Transfer
Contents
Overview
Import ASCII
Contents
Export Mask
Export to Drilling
Addition Parameters
Regularise Model
Tri-Block Parameters
Delete Blocks
Extract Blocks
Convert Classic to Extended
Model to CSV
CSV to Model
Archive
Load Archive
Coalesce
Reserves
Contents
General
By Polygon
Cubic Reserves
Reserves To Attributes
Advanced Reserves Editor
Process Dump File
Advanced Grade/Tonne Report
Category Definition
Catagory Populations
Category Reserves
Dynamic Reserves
Variography
Contents
Overview (Gslib)
Variogram Model Types
Directional Variogram
Directional Variogram Editor
Basic Interface
Directional Variography
Samples Database
Sample Database
Select using Numeric tag
Select using Character tag
Select using Solid triangulations
Select using Field restrictions
Variograms directions
Variograms type
Directional Autofit
Variograms fitting
Constraints
Save and Run
Create Variogram
Cube
Cube Editor
Cube Interactive
Cube Multi Display
Block Model Varoigram
Auto Fit
Display
Multi Display
Output
Edit
Zonal
Remove
Unfolding
Contents
Create Unfolding Model
Create Anisotropy Model
Grade Estimation
Overview
Univariate Estimation Editor
Contents
Validation Estimation Editor
Post Estimation
Herco Analysis
Kriging Neighborhood Analysis
Run
Batch
Codes
Explain
New Estimation File
Open Estimation File
Run Estimation
Run Estimation Multi
Estimation Summary Report
Rotation Angles
Display Ellipsoid
Remove Ellipsoid
Delete Estimation ID
Gaussian Transformations
Contents
Normal Score
BM Normal Score
Stepwise Gaussian
BM Stepwise Gaussian
Normal Score Back
Stepwise Gaussian Back
Simulation
Contents
Sequential Gaussian
Multi-Gaussian
Sequential Indicator
Contents
Variogram Average
Validate Simulation
Post Simulation
Pit Optimiser
Contents
Edit
Run
Batch
Viewing
Floating Cone
Cut Off Grade Optimiser
Overview
COG Optimiser Editor
C.O.G. Optimiser Editor
Open Specification
Optimisation
Reserves
Financials
Products
Combinations
Capacities
Reports
Charts
Save & Run
Sequencing Accumulation and Reporting
Introduction
Specification File
Specification File
Periods
Block Models
Products
Process Plant
Tonnage and Bench
Sequence
Filter Selection
Target
Region Selection
Output Triangulation Options
Accumulation
Accumulation
Reporting
Reporting
Display Blocks
Display Triangulations
Generate Triangulations for Period
Solids Animation
Save
Grade Control Optimiser
Grade Control Optimiser
Grade Control Polygons
Contents
Whittle 4D
Contents
Overview
Set Up
Edit fd.ini
Edit Whittle Parameters
Export Model
Export Polygon
Import Results
Perform Run
Re-block
Create Arcs
Optimise
Print Blocks
Analyse Results
Utility
Edit Model Parameters
Iroad
Contents
Introduction
Data Structure
Quick Reference
Terminology
Files
Contents
Overview
Load
Remove
Set Up
Topography
Subsurface
Bulking Factor
Haul Costs
Edit
Contents
Intersection Points
Design Alignment
Long Section
Balance
Mark
Road Sections
Conditional Sections
Apply Sections
Connect Sections
Design Superel
Define Bridge
Topography
Subsurface
View
Contents
Plan
Long
Road
Drive
Quantities
Contents
End Area
Triangle
Mass Haul
Balance Line
Bulking Factor
Haul Costs
Plotting
Contents
Label
Sections
Survey
Contents
Display Stations
Remove Stations
Radiate
List
Survey
Contents
Overview
Surveying
Contents
Overview
Set Up
Create
Upload
Download
Convert
Edit
Resection
Reduction
Coordinates
Traverse
Edit Codes
Lava
Import Vulcan Field File
Create Station Library
Edit Station Library
List Station Library
Maintain Station Library
Display Stations
Remove Stations
Radiations
Adjustment
List Survey
Create Triangulation
Load Triangulation
Contour
Remove Triangulation
Blast Setout
Contents
Overview
Load
Create Survey
Report Survey
Edit Ticket
Label On Ticket
Label Off Ticket
Survey Volumes
Contents
Overview
Working Section
Create Section
Insert Section
Delete Section
Generate Profile
Area
Volume
Part Volume
Plan View
Section View
Create Triangulation
Load Triangulation
Contour
Remove Triangulation
UG Survey
Contents
Overview
Traverse
Traverse By Single
New Traverse
Radiations
Report Offsets
Laser Offsets
Create UG Drive
Create Solid
Create Survey Triangulation
Overview
Open
DGD and Layer
Floor objects
Back objects
Save
Build 3D Drive
Generate UG Drive Strings
Over/Under Break
Transformations
Contents
Overview
Lat/Long To XYZ
XYZ To Lat/Long
UTM To Lat/Long
Set Up Local
Local To UTM
Geology
Contents
Introduction
Drilling
Contents
Overview
Open Database
Load Drillholes
Remove Drillholes
Multiple Trace Display
Selection Filter
Report Filter
Run Report
Flag
Register
Model
Mapfile
Bench Plans
Identify
Label On
Multi-Label On
Multi-Label Properties
Label Off
Radius Labelling
Remove Labels By Radius
Toggle Disc Display
Colour
Composite
Intersect
Selection Properties
Data Tips
Load Structures
Load Desurvey
Edit Desurvey
Report Desurvey
Drilling Utilities
Contents
Overview
DB Record Definition
Horizon List
CoreViewer
Check Drillholes
Create/Modify Locate
Run Locate Definition
Delete Locate Definition
Synthetic Holes
Mapfile Build Macro
Macro Definition
Database
Record
Horizon
Standard Mapfile
Horizon Criteria
Mapfile Parameters
Composite Mapfile
Variable Selection
Composite Parameters
Mapfile Run Macro
Drillhole Planning
English Log Translation Setup
English Log Generation
Specifications
Database
Schema
Hole Selection
Report Setup
Headings
Header Tables
Interval Table
Footer Tables
Output Options
Plot Available Pattern Table
Coal Borehole Graphics Pattern Definition
Coal Borehole Graphics Specifications
Coal Borehole Graphics Plot
Drilling Section
Contents
Display Settings
Create Section
Create Grid Section
Load Section
Save Section
Reverse View
View Next Segment
Apply Display Settings
Add Hole
Remove Hole
Align Holes
Reset Holes
Database Correlation
Clear All Database Correlations
Grid Correlation
Clear All Grid Correlations
Select Intervals
Select Intervals by Field
Select Bore
Select All
Deselect Bore
Deselect All
Edit Intervals
Save Edits
Drillhole Planning
Contents
Evaluate Drill Density
Create Drill Targets
Create Drillholes
Edit Drillholes
Reporting
Deviation Calculation Manager
Drill Rig Setup Specification
Cost Estimation Specification
Reposition Hole
Drillhole Optimiser
Contents
Drill Rigs Library
Drillhole Optimiser Editor
Downhole Geophysics
Contents
Interactive Editor
Overview
Geophysical Settings
Geophysical Settings
Data Source
Trace Selection
Lithology
Window Settings
Open Window
Import LAS Files
Edit Trace Specifications
View Traces
Label Traces
Remove
Remove All
Geophysics
Contents
Import From DB2
Edit and Display
View Traces
Remove
Remove All
Load
Rename/Flip Traces
Depth Conversion
Null Value
Convert
Generate
Invoke Macro
Save Macro
Edit Macro
Fault Manipulation
Contents
Overview
Projection
Generate Fault Mask
Surface Projection
Dynamic Edit
Grid Reserves
Contents
Overview
In Situ
Reserves
Bench
Resource Polygons
Compositing
Contents
Compositing
Run
Selection
Display
Remove
Sampling
Contents
Overview
Open Database
Load
Edit Sample
Remove
Check/Remove Duplicates
Colour
Identify
Annotation On
Annotation Off
Contour
Symbols On
Symbols Off
Flag Samples
Flag Samples
Samples Database
Triangulation
Block Model
Polygon
Script
Cell Decluster
Database Drift Analyser
Database Drift Analyser
Samples Database
Select Using Numeric Tag
Select Using Character Tag
Select Using Field Restrictions
Select Using Solid Triangulations
Block Model
Block Selection
Define Moving Window
Output
Vulcan Options
Excel Options
Contact Profile Analyser
Overview
General
Samples Database 1
Select Using Numeric Tag
Select Using Character Tag
Select Using Field Restrictions
Select Using Solid Triangulations
Samples Database 2
Select Using Numeric Tag
Select Using Character Tag
Select Using Field Restrictions
Select Using Solid Triangulations
Output
Vulcan Options
Excel Options
Save & Run
Multivariate Transformation
Overview
Forward Transformation
Numeric Tag
Character Tag
Triangulation
Field Restrictions
Report
Backward Transformation
Block Selection
Import Points
Import Attributes
Export ASCII
Setup Display
Open Scheme
Custom Database Format
Sample Display Attributes
Sample Restrictions
Select Using Numeric Tag
Select Using Character Tag
Select Using Solid Triangulations
Select Using Field Restrictions
Labelling
Channel Sampling
Contents
Overview
Open Database
Datasheet
Location
Attributes
Associate Channel
Move Channel
Rotate Channel
Rotate Channel Dip
Rotate Channel Bearing
Load Channel
Identify
Annotation On
Annotation Off
Composite
Remove Samples
Implicit Modelling
Implicit Modelling Editor
Overview
Open Specifications
Parameters
Samples Database
Select Using Numeric Tag
Select Using Character Tag
Select Using Solid Triangulations
Select Using Field Restrictions
Block Model
Domains
Polygons
Advanced
Geological
Pre Drilling Process
Synthetic Drillholes
Implicit Solids
Steep Horizon Modeller
Overview
Database
Horizons
Design Data
Data Extent
Method
Relimit
Triangulations
Block Model
Save Points
Change Log
3D Geological Sculpting
Washability
Contents
Overview
Setup
Contents
Source Database Setup
Delete Source Database Setup
Analyse Washability Data
Standardisation Settings
Delete Standardisation Settings
Waste/Missing-Interval Defaults
Delete Waste Defaults
Import/Export Custom Settings
Product Graph Settings
Standardise Tables
Generate Models from Standardised Tables
Open Generated Models Group
Interrogate Generated Models
Report from Washability Table
Combine Washability Tables
Close Models Group
Delete Models Group
Import Table
Export Table
Geotech
Contents
View
Contents
Overview
Primary
Stereonet
Rose Diagram
Display
Contents
Overview
Open Database
Set Up 3D Display
Load To 3D
Remove From 3D
Set Up Stereonet
Load To Stereonet
Remove From Stereonet
Set Up Rose Diagram
Load To Rose
Remove From Rose
Set Up Multiple Rose Diagrams
Load To Multiple Rose
Remove From Multiple Rose
Set Up Tadpole Display
Load To Tadpole
Remove From Tadpole
Set Up Stickplot Display
Load To Stickplot
Remove From Stickplot
Analysis
Contents
Overview
Assign
Contour
Create
Create Triangulation Plane
Daylight Windows
Group
Ungroup
Slope
Transfer
Identify
Highlight
Zone
Annotate
Utilities
Contents
Overview
Database Import
Convert
Annotation On
Annotation Off
ASCII Import
ASCII Export
CSV Export
Edit Codes
Edit Structures
Data Entry Setup
Digitise
Select
Line
Edit
Delete
Plot
Plot
Using an Existing Drafting Sheet
Using a Default Template
Map Image to Drillhole
Section
Contents
Overview
Set Up
Open Working Layer
Close Working Layer
Create Section
Create Profile
Create Slice
Strat Profile
Surface Profile
Section View
Plan View
Section Visibility
Profile Visibility
Analyse
Axes
Annotate
Rename Section
Delete
Edit Point
Open Pit
Contents
Introduction
Open Cut Design
Contents
Flag Toe/Crest String
Tolorence
Assign Berm/Batter Values
Condition String
Project String
Shadow Tool
Berm String
Auto Pit
Incline
Multi Incline
Pairs
Toes and Crests
Update Toe
Blocks
Interactive Cut Planner
Cut Reporting
Progress Maps
Dump Design
Rehab Design
Pit Topography
Update Topography
Define Angles
Planes
Move Pit/Dump Wall
Relimit
Make Mask
Phase Generator
Performance by Phase-Bench
Compliance
Sawtooth
Integrated Stratigraphic Planning
Create Pit/Highwall Surfaces
Pit Topography
Split Pit Setup
Split Pit
Clip Solids
Update Solids
Contents
Triangulation Visibility
Export Triangulation Attributes
Schedule Solids
Overview
Mining Solids
Mining Blocks Set up
Mining Blocks Edit Polygons
Ming Blocks Create
Rename Blocks by Ramp Distance
Ramps
Contents
Overview
Conventions
Problem Solving Guide
Design Pit/Dump
Simple
Advanced
Highwall
Assign Berm/Batter values
Graphics Toe/Crest/Road
Visibility Toe/Crest/Road
Condition String
Build Road
Insert road Pit/Dump
MKRD
Road Line
Cut and Fill Roads
Contents
Solid Ramp
Talpac Export
Talpac Start
Phase Design
Contents
Phase Design
Pit Diference/Union
Triangulate/Reserve
Pit Layout
Contents
Overview
Create Strip and Blocks
Offset Strips
Fan Strips
Crop Strips
Slice Strips
Block Layout
Join
Split
Limit Strip/Block
Naming
Reverse
Terrace Mining
Contents
Set Up
Specification
Run Reserves
Report
Benching and Batters
Contents
Overview
Set Up
Direction
Toggle Marks
Marker Size
Change Wall
Reverse Wall
Create Macro
Edit Macro
Assign Macro
Inquire
Auto Project (Mesh)
Auto Project
Manual Project
Seed From Wall
Block from Wall
Block Number
Solids from Projections
Section
Map File
Annotate
Horizon Legend
Horizons Visibility
Blocks Visibility
Batvol
Contents
Overview
Specification
Run Batvol
Inquire
Report
Plot RIN Data
Vertical Reserves Specification
Run Vertical Reserves
Dump File Reporting
Contents
Create from RIN
Reports
Page Setup
Tables
Save and Report
Pit Volumes
Contents
Create Sections
Insert Sections
Create Profiles
Working
Volume
Dragline Spoil
Dragline Surface
Bench Volumes
Haulage Profile
Contents
Overview
Truck Library
Build Route Network
Route Cycle Estimation
Model Route Calculation
View Bench
Contents
Section Design
Contents
Overview
Working
Create Sections
Insert Sections
XS On Lsection
Strat Profiles
Surface Profiles
C&F Volume
Section View
Plan View
Long Section View
Stack Sections
Axes/Grid
Template
Cut & Fill
Annotate
Range Diagram
Monitoring
Contents
Data Mapping
Display Settings
Select Data
Deselect Data
Identify
Annotate
Filter
Report
Export
Model
Dozer2000
Contents
Convert Files
Create/Edit Plan File
Create/Edit Vehicle File
Dig Limits
Contents
New Entry
Edit
Display
Run
Script
Oilsands Options
Contents
Total Volume in Place
Block Area Averaging
Block Selection
Dilution Modelling
Ring It
Automated Pit Designer
Strategic Designer
New Pit Design
Modify Pit Design
Evolution
Grade Control
Contents
Setup
Define Data Sources
Grade Control Database Setup
Specifications
Blast Header
Blast Solid
Blast Boundary Strings
Grade Block
Grade Block Solid
Options
Blast Holes
Reconciliation
Face Points
Boundary String Triangles
Samples Source Setup
Data Source Correlation
Calculation Rules
Calculation Rules General Help
Assignment Rules
Block Model Weight Rules
Estimation ID
Hole Weight Rules
Reconciliation Rules
Display Configuration
Material Report Setup
Preferences
Validate Current Specifications
Convert Specifications
Legacy Blast Solids Validation
Load Specifications
Save Specification
New Blast
Save Blast
Save Blast As...
Load Samples
Load Blast
Remove Blast
Set Current Blast
Define Blast Solid
Solid Triangulation
Surfaces
Levels
Dynamic Reblock Blast
Polygonal Blast Generation
Create Grade Blocks
Create Grade Blocks
Lines/Polygons
Triangulations & Whole Blast
Reblock Blast
Edit Grade Blocks
Edit Blast Holes
Blast Hole Selection Criteria
Edit Blast Holes Table
Reposition Grade Block Label
Delete/Replace User Polygon
Import Blast Holes
Source
CSV Column Mapping
Import Options
Select Holes to Import
Import Grade Block Solid
Blast Report
Create Bench Plan
Blast Selection Parameters
Select Blasts
Blast Selection
Grade Block Display
Grade Block Data
Reconciliation Grade Block
Reconciliation Block Model
Design Data
Material Report
Export Data
Triangulations
Design Objects
Underground
Contents
Introduction
Coal Development
Contents
Overview
Open Mine Workings
Graphical Attributes
Feature Visibility
Create Heading
Create Crosscut
Convert To Heading
Convert To Crosscut
Delete Drivage
Define Panel Type
View Panel Type
Edit Definition
Delete Definition
Create Panel
Modify Panel
Delete Panel
Pillars/LT Outlines
Area
Roadway Blocks
LS/SW Pillar Convert
Create Outline
Combine Blocks
Clip Blocks
Delete Blocks
Coal Reserves
Contents
Overview
Open Mine Workings
Geology Setup
Project
Reserve Setup
Run Reserve
Delete Projected
Development
Contents
Overview
Set Up
Automatic Ramp
Automatic Ramp Overview
Open Specification
Constraints
Block Model
Exclusion Zones
Primitives
Reserves
Interactive Edit Ramp
Level Layout
Centre Line
Cross Cuts
Wall Outline
Merge Walls
Union Walls
Project Backs/Floors
Generate UG Drive Strings
Apply Curve
Corner Peel
Costing
Define Ring
Expand Ring
Partial Gradient
Information
Model Backs/Floors
Point(s) Annotation
Line(s) Annotation
Analyse
Contents
Cost Benefit Analysis
Global Gradient
Drill Hole Warning
Proximity Alert
Find Entry Point
Stope Analyser
Stope Optimiser
Overview
Open Specification
Input
Restriction
Block Selection
Output
Verifications
Stope Framework
Dimensions
Optimisation Control
Cutoff
Slice Method
Slice Method Slice Definition
Slice Method Stope Geometry
Slice Method Post Processing
Section Method
Section Method Slice Definition
Section Method Stope Geometry
Section Method Post Processing
Restrictions
Prism Method
Risk
Explain
Over/Under Break
Stope Design
Stope Design menu contents
Overview
Directory
Open
Create Stope
General Reserves
Backfill Planning
Mine
Ring Design
Contents
Overview
Create/Edit Specification File
Edit Display Preferences
Templated Ring Design
Create/Edit Database Design
Create/Open Blast Database
Create Rings
Create Rings Index
Rename Rings
Auto Profile
Calculate Ring Reserves
Display Rings
Remove Rings
Navigate Rings
Display Current Ring Name and Dump Angle
Change Ring Dump Angle
Display Characteristics
Create Hole
Create/Edit Five-Spot Hole
Move Hole
Copy Hole
Delete Hole
Edit Hole Diameter
Shuffle Holes
Adjust Hole Length
Comment Hole
Layout Hole Pattern
Fill Hole Pattern
Change Hole Sequence
Explosives Loading
Explosives Loading menu contents
Load Hole
Load Ring
Edit Hole Loading
Edit Hole Capping
Explosives Timing
Edit Ring Report Format
Edit Ring Report Format
Layout
Drilling
Explosives
Sorting Columns
Report on Rings
Plot Rings
Export to IREDES
Ventilation
Contents
Create / Open Network
Save Network
Close Network
Defaults
Open Fan File
Add Fan
Edit Fan
Delete Fan
Save Fan File
Display Attributes
Create Branch
Edit Branch
Edit All Branches
Reverse Branch
Delete Branch
Insert Node
Move Node
Execute Simulation
Report
Panel Caving Designer
Dragline
Contents
Overview
Files
Contents
Open
Save
Save As
Close
Delete
Dragline Equipment
Ancillary Equipment
Block Report
Operation Report
Volume Report
Sections
Contents
Working
Define
Create
Delete
Set Current
Advance Current
View Current Section
Define Origin
Edit Label
Attributes
Change Section Line RLs
Horizons
Contents
Create/Edit Horizons
Create/Delete Surfaces
Strips
Contents
Create
Delete
Edit Extents
Translate All
Highwall Profile
Edit Labels
Label Attributes
Create Max Spoil Profile
Create Spoil Fit Report
Generate Toes and Crests
Points
Contents
Create Points
Delete Points
Edit Point Names
Line Intersection
Blocks
Contents
Create
Delete
ID Block
Set Swell Table
Edit Repose
Edit Swell
Edit Rehandle
Reset Log File
Reset Undo Stack
Reset Section
Edit Label
Drag Label
Rotate Label
Recentre Labels
Unrotate Labels
Label Attributes
Move Blocks
Contents
Overview
Start/End Sequence
Begin/End Macro
Dragline - Right Toe
Dragline - Centre
Dragline - Left Toe
Bulldoze - Left
Bulldoze - Right
Bulldoze - Uphill
Bulldoze to Bench
Area Balance
Area Reshape
Area Cut & Fill
Split Block
Merge Blocks
Create Block
Remove Block
Export Block
Nullify Block
Select Dragline
Set Position
Unset Position
Undo
Redo
Animate
Templates
Contents
Overview
Create
Create From Surface
Create Dragline Bench Template
Delete Template
Convert Profile
Import
Lines
Contents
Create
Delete
Edit Label
Attributes
View
Contents
Setup
View Current Section
Change View
Reverse View
Coordinate
Distance
Link Strings
Horizon Legend
Dragline Legend
Reset Visibility
Toggle Sections
Toggle Surfaces
Toggle Strips
Toggle Block Labels
Toggle Templates
Toggle Lines
Toggle Points
Toggle Other
Dragnav
Contents
New
Preview
Save
Plan Surfaces
Plan Data
Interactive Sections
Multiple Sections
Drill and Blast
Contents
Files
Drill Rig Library
Explosives Library
Specifications
Specifications
Explosive Loading Styles
Pattern Specifications
Reporting Specifications
Posting Specifications
Display Characteristics Settings
Load
Remove
Create
Create
Create Holes At Points
Create Holes Along Line
Create Holes Along Collar and Toe
Create Holes To Free Face
Create Registered Outline
Create Blast Solid
Explosives Tie-ins
Create Timing Model
Create Timing Animation
Edit
Rename Blast
Edit Visibility
Edit Display Attributes
Apply Display Characteristics
Split Blast By Polygons
Merge Blasts
Edit Holes
Rename Holes
Rename All Holes By Object
Modify Hole Name
Reverse Row Direction
Recalculate
Move Holes
Translate Holes
Rotate Holes
Minimum Burden Adjustment
Delete Holes
Delete Holes by Polygon
Insert Hole
Double Stitching
Design Charge Depths
Analysis and Reporting
Constrained Hole Selection
Compare Holes
Offset to Face
Export Intercepts
Sample Interval Specifications
Export to Database
Hole Clearance Check
Hole Separation Report
Reporting
Tritronics Export
Posting
Export to IREDES
Gantt
Overview
Vulcan
Open
Activity
Create
Delete
Update From Design
Precedences
Vulcan Manual Precedences
Display
Hide
Display Settings
Colour by Periods
Colour by Attributes
Mining Direction
Generate Directions
Flip Directions
Select and Reverse
Display Directions
Hide Directions
Transfer from STP module
Check VGSKEY
Vulcan Gantt Scheduler
About the Interface
Keyboard Shortcuts
Quick Access Toolbar
Gantt Chart Window
Summary Report Window
Notification Center Window
VGS Home
Home Tab
New
Delete Activity
Properties
Update Activities
Update Reserves
Percent Complete Update
Split
Remove Split
Join All Bars
VGS Setup
Setup Tab
Project Options
Reserve Attributes
Attributes
Activity Types
Lookup Tables
Calendars
Plan Start Date
Periods
Current Period
VGS Layout
Layout Tab
Groups
Current Group
Sorting
Column Format
Column Order Manager
Current Column Order
Update Column Order Definition
Save/Load/Reset
To Move/Move Here
VGS View
View Tab
Vulcan Selection
Vulcan Zoom
Vulcan Hide
Vulcan Shadow
Select in Vulcan
Zoom in Vulcan
Colour by Periods
Colour by Attributes
Animation
Current Colour
Caption Manager
Filters
Current Filter
Select Multiple Filters
Display Resource Calendar
VGS Precedences
Precedence Tab
Group Manager
Current Precedence Group
New Group
Spatial Precedences
Create
Remove
Properties
Precedence Arrow Visibility
VGS Report
Report Tab
Report Setup
Sync Report
Pivot Table Report Manager
Create New Pivot Table Report
Activity Grid
Current Report
Export Activity Grid To Excel
Activity By Period
Critical Path
VGS Resources
Resources Tab
Settings
Allocate Resources
Open Resource Chart
Export Resource Chart To Excel
VGS Levelling
Levelling Tab
Resource Levelling Setup
Levelling by Capacity
Activity Leveling Setup
Current Levelling
Labs
Face Mapper
Setup
Create Resources
Create Feature Files
Configuration
Create Plot Resources
Tools
Key Toolbar
Import GSI Station
Freeze Grids Back Walls
Load Drillholes
Remove Drillholes
Display Comment Labels
Remove Comment Labels
Display Structures
Section View
Grid On
Grid Off
Mapping
Load Drive Layer
Add Station
Rename User Station
Station Section
Walls Mapping
Backs Mapping
Lines To Samples
Feature Lines
Lines To Polygons
Feature Replace
Feature Structures
Face Reserve Grades
Face Grades
Wall Grades
Back Grades
Digitise Grades
Calculate Rock Mass Classification
Add Comment
Pictures
Picture Display
Picture Crop
Picture Scale
Picture Translate
Picture Rotate
Post Processing
Register Face
Fold Profile
Unfold Profile
Design To Actual
Flag Contact Points
Extract Contact Points
Plot Face
Export Face Comments
Export Face Summary
Picture Copy
Pre-Setup Process
Intended Workflow – Backs/Walls Mapping
Intended Workflow – Face Mapping
FAQ/Troubleshooting
Appendices
Workbench
Workbench Menu Contents
Load Layout
Save Layout
Initial Layout
Customise
Localisation
Context Menus
Hotswap
Isis Database
Introduction
Introduction to Isis
Database Designs
Database Elements
Databases
Common ODBC Problems
Database Recovery
File
New Database
Open Database
New Design
Open Design
Examples for download
Close
AcQuire
Vega ODBC
Save
Save As
Save Design As
Delete Database
Delete Design
Quit Isis
Exit Workbench
Edit
Cut
Copy
Paste
Select All
Delete
Find
Find Next
Preferences
View
Data View
Design View
Object
Insert
Delete
Table
Insert
Append
Delete
Insert Records
Sort Ascending/Descending
Utilities
Import
Database
Tables
Export
Database
Tables
Convert ODBC dsf to Headered
Convert Headered ODBC to dsf
Convert Back to Shorter Names
Field Calculation
Script
Edit
Run
Validate
Specifications
Select Database
Collar Checks
Unique Collar Location
Collar on Surface
Downhole Checks
Empty Table
Total Depth
Overlapping Intervals
Increasing and Decreasing
Maximum variation
Unique Values
Sequence
Derived Value
Along Recod Checks
Field Sum
Individual Field Checks
Minimum and Maximum Values
Translations
Case Of
Mandatory
Expression
Report
Save and Run
Database Generation
Script Structure
Script Directives
Definitions and Generators
Conditional Statements
Command Lists
Input and Output
Examples
Query Language
Introduction
Running Inquisitor
Language Syntax
Using the Language
Record Statement
Record Variable
Data Statement/Variable
Expressions
Exec Statements
Control Statements
Reference
Example Script
Commandline Programs
Overview
Analysis
ASCIIT2TRI
APD
BADD
BASSIGN
BBENCH
BCALC
BCHOP
BCHNAME
BCONVERT
BCSVTO
BDECOMPRESS
BDELETE
BEDTAB
BEDVAR
BEFSUMREP
BEXPORT
BEXPR
BEXTENT
BEXTRACT
BFILL
BHEAD
BHISTORY
BIMPORT
BINDEX
BINSERT
BLOCK_TO_PEXEL
BM_DOUBLE_TEST
BMARCH
BMARCHV2
BMASK
BMERGE
BMINE
BMODEL
BOPTIMISE
BORIGIN
BPITVIEW
BREBLOCK
BRESERVE_V2
BRESET
BREVERSE
BRIMPORT
BSTRAT
BSTRAT2
BTOCSV
BTRANSFORM
BTRIANGLE
BTRIBLOCK
BTRIFLAG
BUNCHOP
BUPGRADE
CompareBlockmodels
CompareDGDs
CompareGrids
CompareTris
Compliance
COMPRESS_DGD
CopyDGDLayerTo
DATUPD
DBCMPT
DBLIST
DBLOAD
DBMERG
DBSCRIPT
DBTABL
DECLUSTER
DGD2DGN
DGD2DWG
DGDDUMP
DGN2DGD
DJBMEST
DJBMESTMULTI
DSF_A2B
DSF_B2A
DWG2DGD
EXEBMNSCORE
EXEBMSCTRAN
EXEDJSISIMMR
EXENSBACK
EXENSCORE
EXEPOSTSIM
EXESCBACK
EXESCTRAN
EXESGSIM
FIXDHD
FLAGDRILLDB
FLAGSAMPDB
GCOPT
GEOTECH_CONVERT
GIF_TO_PEXEL
ImportCSV
level_layout
MERGE_DGDS
MVTRANSFORM
RGB_TO_PEXEL
RGB_TO_PS
RGB2RTL
SPEC_MERGE
TIF2IREG
TRI2IV
TRIADJPOINTSDGEN
TRIAPPEND
TRIBENCH
TRIBOOL2
TRIBOOLEAN
TRICLEAN
TRICLOSE
TRICUTFILL
TRICVOLUME
TRIDISPLAY
TRIDM
TRIDUMP
TRIFAULT
TRIFILTER
TRIGEMCOM
TRIGRID
TRILOAD
TRIMAKE
TRIMINESIGHT
TRIPRODUCE
TRIREGISTER
TRIRELIMIT
TRISHELL
TRISIMPLIFY
TRISNAP
TRISPLIT
TRISUBTRACT
TRITEST
TRITRANS
TRITVOLUME
TRIVOLUME
TRIVOXELATE
UNCOMP
VDA
VULC_STOPEOPT
Block Model Utility
Overview
Starting the Block Model Utility
File
New
Close
Open
Save
Save As
Quit Block Model Utility
Exit Workbench
Model
Create Model
Estimation
New Estimation Run File
Open Estimation Run File
Execute Estimation Run File
Run Estimation
Rapid Pit Design
Contents
Introduction
Properties Window
File
File menu contents
Load Specification
Edit Specification
Components
Benches
Pit Design
Reserving
Preferences
Quit Rapid Pit Design
Exit Workbench
Utilities
Utilities menu contents
New Component
Projection Method
Create Polygon
Insert Ramp
Insert Switchback
Flag Ramp
Project
Polygon Offset
Replace String
Move Point
Delete Point
Delete Polygon
Delete Multiple Polygons
Join Components
Intersect Components
Clip Phases
Clip Components
Generate Reserves
Next Bench
Previous Bench
Measure Distance
Measure Angle
Reacquire Attributes
Plotting Utility
File
Open
Close
Close All
Save As Image
Page Setup
Print
Print All
Batch Print
Quit Plot Utility
Exit Workbench
Troubleshooting Guide
Tutorials
Tutorials
Vulcan Data Analyser
Creating a Variogram
Creating a Fan Variogram
Filtering Data
Transforming Data
Chart Viewing and Exporting
Block Menu
Opening a Block Model
Building a Block Model
Load_Dynamic_Model
Polygon Flag
Support Analysis
Ellipsoid Method
Pit Optimiser Charting and Reporting
Pit Optimiser Visualisation of Pit and Period
Design Menu
Getting Started
Templated Attributes
Applying Conditional Attributes
Applying Datatips
Applying User-Defined Vulcan Attribute Datatips
Using the Find Functionality
Creating Moving Objects
Initiating a Vulcan Command
Initiating a Lava Script
Polygon Morph
Intelligent Objects Tutorials
File Menu
Import CSV
Create 3D PDF
Gantt Scheduler
Gantt Scheduler Creating Activities
Gantt Scheduler Creating Precedences
Gant Scheduler Resource Allocation and Leveling
Gant Scheduler Animation
Gantt Scheduler Summary Report
Gantt Scheduler Viewing and Interacting with Activities
Geology Menu
Downhole Geophysics
Principle Component Analysis
Isis Database
Creating a Samples Database
Open Pit Menu
Highwall Roads
Multiple Roads
Haulage Profile Route Cycle Estimation
Rapid Pit Designer
Rapid Pit Design
Underground Menu
AutomaticRamp
InteractiveEditRamp
CentreLine
UndergroundRingDesign
View Menu
AutoView
Preferences
Overview
Vulcan
Vulcan Explorer
File Types
Triangulations
Grids
Dialogs and Popups
Graphics
Input
Colours
Effects
Video Capture
Defaults
2D Text
3D Text
Arrows
Dimension
Draw by Hand
Triangulation Attributes
Load Dynamic Model
Miscellaneous
Paths/Directories
Plot All
Dragline
Drill and Blast
Plot Utility
System
Appendices
File Information
Archived Layers
Colour Scheme
DXF Conversion Table
Features Specifications
Vulcan Defaults
Primitives Specifications
Start Up Parameters
Statistics Definition File
Tiled Texture Resource Specifications
Transformation Matrices File
Vulcan Design Database Listing
Window Parameters
ASCII Map
Batch Plotting Specifications
Batch Plotting Report
Standard Patterns
Standard Peripheral Devices
Pitboss Transfer File
Menu Appendices
File
Class Libraries for maptek.vulcan
maptek.vulcan.attributes
maptek.vulcan.block_model
maptek.vulcan.callback
maptek.vulcan.dgd
maptek.drillhole_database
maptek.vulcan.grid
maptek.vulcan.isisdb
maptek.vulcan.layer
maptek.vulcan.mapio
maptek.vulcan.metadata
maptek.vulcan.arrow
maptek.vulcan.polyline
maptek.vulcan.dimension
maptek.vulcan.text
maptek.vulcan.text3d
maptek.vulcan.point
maptek.vulcan.section_widths
maptek.vulcan.tri_attributes
maptek.vulcan.triangulation
maptek.vulcan.variant
Class Libraries for maptek.vulcan_gui
maptek.vulcan_gui
maptek.vulcan_gui_options
maptek.vulcan_gui.gpan
maptek.vulcan_gui.panel
maptek.vulcan_gui.pick_point
maptek.vulcan_gui.selection
maptek.vulcan_gui.temp_object
Model
Model Appendix A
Stratigraphic Horizons
Modflow Control
Model Appendix B
Boundary Conditions (Aquifem-n)
Grid Calc
Grid Calc_Appendix A
GridCalc Appendix A: File Information
Fixmap Split Definitions File
Fixmap Specification File
Database Conditions
Macro Commands
Grid Calc Global Specifications
Addtdlitho.dbg
Stratigraphic Horizons
Grid Calc Appendix B
Grid Model Scripts
Grid Calc Appendix C
Overview
Running Fixmap from the command line
Common Problems
Creating a Fixmap Database
Hand Editing Mapfiles
Rsvute
Rsvute Appendix A
File Information
Reserves Specifications
Table
Polygon Reserves Sequences
Reserve Macros
Grid Calc Global Specifications
Grid Calc Macros
Rsvute Appendix B
Using Benching and Batters
Using Benching and Batters
Using Benching and Batters
Bench Grid Creation
Limit Polygon Creation
Wall Projection
Specifications
Using Limit Polygons
Using Grid Masks
Block
Block Appendix A
File List
ASCII Block Model Regular
ASCII Block Model Sub Blocked
ASCII Map
Block Model Definition File (Block Construction)
Block Definition (Block Transfer)
Advanced Reserves Calculation Results
Advanced Reserves Calculation Parameters
Advanced Reserves Report Parameters
Advanced Reserves Report
Block Manipulation Script - 1
Block Manipulation Script - 2
Block Manipulation Script - 3
Block Manipulation Script - 4
Stratigraphic Horizons
Variogram Experimental Model
Variogram Parameters
Variogram Results
Variogram Fitting/Editing/Conversion
Variogram Display Parameters
Variogram Block Definition
Block Variables Assignment File
Block Identifier File
Tri-Blocking Parameters File
Block_Appendix_B
B - Whittle 4D Errors
Block_Appendix_C
Overview
Whittle 4D Interface
Exporting to
Importing from
Terminology
Block_Appendix_D
Geostatistical Modelling
Introduction
Regionalised Variables
Structural Analysis - Variography
Semi-Variogram Properties
Continuity
Zone of Influence
Anisotropies 1
Model Variograms
Variogram Modelling
Nested Structures
Anisotropies 2
Proportional Effect and Relative Variograms
Origin of Nugget Effect
Regularisation
Auxiliary Functions
Extension and Estimation Variance
Grade Interpolation - Kriging
Geological Modelling Consideration
Iroad
Notes on Slopes and Grades
File Information
Default Design Parameters
Slopes and Grades Specification
Survey
Appendices
Survey Appendix A
File Information
Least Squares Adjustment Report
Bowditch Adjustment Report
Coordinates Report
Input Observations File
Radiation Report
Reduction Report - SDR22
Reduction Report - TOPCON
Offsets Report
Stations Library File
Survey Codes Files
Upload File - Geodat
Volumes Report
Volumes (Vulcan) Report - Normal style
Volumes (Vulcan) Report - Mine style
Reduction Report - GEODAT
Traverse Reduction Adjustment Report - Unadjusted
Traverse Reduction Adjustment Report - Adjusted
Traverse Calculations Report
Vulcan Field Survey File
Survey Appendix B
Overview
Input Observations File
Horizontal Adjustment
Vertical Adjustment
Survey Appendix C
CRITERION 400
GEODAT
Overview
SOKKIA
TOPCON GTS-7
TRIMBLE GPS
WILD/LEICA
Geology
Contents
Geology Appendix A
File Information
ASCII Map
Section Resources Parameters
Multiple Label Specifications
Sampling Parameters
Scheme File (Grid Reserves)
Translation Table
Composite Specifications
Geology Appendix B
Sampling Parameters
Format of the SMP File
Common SMP Sections
Client Specific SMP Sections
Geology Appendix C
File Information
Inquisitor Template and Metafile Production
Washability Mapfile Structure
Washability
Washability Appendix A
Description of Records and Tokens
Metafile Record Hierarchy
Specimen
Geotech
Geotech Appendix A
Geotechnical Specification
Galena Parameters
Stratigraphic Horizons
Geotech Appendix B
Geotech Display Layers
Open Pit
Open Pit Appendix A
Blast Design Specifications
Blast Reserve Report
Dragline Parameters
Sampling Parameters
Export File (Network Design)
Haul Report
Hole Report (Summary)
Units of Measurement
Hole Report (Full)
Network Defaults
Macros (Benching & Batters)
Multi Stripping Parameters
Operations Parameters
Outline Report
Report Specifications
Reserves Report (Benching & Batters)
Reserves Report (Terrace Mining)
Reserves Report
Reserves Specifications (Benching & Batters)
Reserves Specifications (Terrace Mining)
Stratigraphic Horizons
Terrace Mining Log
Stripping Report (Long Term)
Stripping Report (Short Term)
Stripping Report (Rehandles)
Survey Report
Volume Report
XPAC Export File
XPAC Export File
Monitoring Specifications
RIN Database dump file
Open Pit Appendix B
Format of the SMP File
Common SMP Sections
Angled Benches
Open Pit Appendix C
Macro File Commands
Open Pit Appendix D
Grade Control Design
Date Stamping
Grade Control
Appendix D - Grade Control
Appendix D - Grade Control Design
Appendix D - Date Stamping
Underground
Underground Appendix A
Graphical Attributes File
Underground Blast Display Preferences File
Blast Design Specifications File
Geology Setup Parameter File
Ring Report Style File
Explosives Report Style File
Expression Handling
Panel Structure Template File
Reserve Parameters File
Underground Development Preferences File
Reserve Calculations File
Dragline
Contents
Module Conventions
Dragline Database
Ancillary Database
Example Macro Scripts
Macro Functions
Block History
Named Positions
Specifications File
Over/Under Break
Isis Appendices
Name Conventions
Database Listing File
Field Calculation Scripting
Database Validation
Database Validation (dbdchk program)
Core Appendices
Core Appendices
File Information
Fortran Format Statements
Operators and Functions
Operators/Functions (old Statistics)
Script File Format
RGB Values
Macro File
GEOSTAT
Contents
Basic Concepts
Data Input Processes
Organisation of Databases
Borehole Compositing
Statistical Analysis
Geostatistical Analysis
Economic Evaluation
Reserve Calculations
Other Comments
AMS Stope Shape Optimiser Manual
Contents
Purpose
1 Stope Shape Optimiser
2 Slice Method
3 Prism Method
4 Optimisation Options (Slice & Prism)
5 Geological Risk (Slice & Prism)
6 Running Stope Shape Optimiser External to Vendor Interfaces
Appendix A Common Terms Used
Glossary
Terms
References